The works comprise: Removal of internal partitions and removal of non- original additions, including dust- extraction ducts and AC equipment, attached to the northern elevation. Provision of safe and discreet accessible circulation routes, new fire doors and fire exists to ensure compliance with Building Regulations and meet FSCA and DAC requirements. Replacement of existing artificial roof slates with new natural slates, and insertion of discreet structural elements to preserve the building’s original appearance. Repair and restoration of existing windows and external finishes and reinstating original profiles where necessary, on a like- for-like basis
Cork / Clonakilty / Clonakilty, Cork
Key facts
Lead summary
- Commenced date
- 22 Jun 2026
- Builder / developer
- Cahalane Bros Ltd
- Local authority
- Cork County Council
- Source reference
- CN0143414CC
- Floor area
- 181 m²
- Lead lane
- Current owner-export commencement
Official description
Verbatim source text
The works comprise: Removal of internal partitions and removal of non- original additions, including dust- extraction ducts and AC equipment, attached to the northern elevation. Provision of safe and discreet accessible circulation routes, new fire doors and fire exists to ensure compliance with Building Regulations and meet FSCA and DAC requirements. Replacement of existing artificial roof slates with new natural slates, and insertion of discreet structural elements to preserve the building’s original appearance. Repair and restoration of existing windows and external finishes and reinstating original profiles where necessary, on a like- for-like basis
Verify against official sourceLikely trades & supplier leads