Commencement notice group

Commencement notices — Dublin

Dublin, Dublin

2 separate notices · latest notified commencement 28 Aug 2025 · planning reference supplied

Source notices
2
Latest notified commencement
28 Aug 2025
Latest notice
392 m²
Planning references supplied
3431/24
Public location
Dublin, Dublin

Public source geography

Site location

Public site / locality
Dublin, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference3431/24

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0132250DC BCMS owner-supplied export

Refurbishment of 20 Northbrook Road

392 m² · stated on this notice

Planning reference 3431/24 Builder stated: Istra Construction
CN0132253DC BCMS owner-supplied export

Repairs to damaged brickwork to front elevation and chimneys, repointing of brickwork, and repairs to damaged roof slates.

392 m² · stated on this notice

Planning reference 3431/24 Builder stated: DA AND DEN LTD

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.