Commencement notice group
Commercial commencement notices — Pembroke Row
Pembroke Row, Dublin
5 unique commencement events · latest notified commencement 01 Nov 2016 · planning basis not stated
- Unique commencement events
- 5
- Latest notified commencement
- 01 Nov 2016
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- Pembroke Row, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Pembroke Row, Dublin
- County
- Dublin
Notice location variants
- Dublin CN0003909DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The overall development consists of a new office building of six storeys (over basement); approx. 17,658 sq.m. This element of the project (Phase 5 of 5) consists of the internal fit-out of the building and completion of remaining works to the external site area.
The overall development consists of a new office building of six storeys (over basement); approx. 17,658 sq.m; this element (Phase 4) of the project consists of the construction of the structural shell & core of the building, with the internal fit-out (Phase 5) to follow (which will be subject to a separate Commencement Notice).
The overall development consists of a new office building of six storeys (over basement); approx. 17,658 sq.m; this element (Phase 3) of the project consists of the bulk excavation and concrete piling of the site, as well as the diversion of electrical cables; all in preparation for the main structural works (Phase 4) which will follow (and will be subject to a separate Commencement Notice).
The overall development consists of a new office building of six storeys (over basement); approx. 17,658 sq.m; this element of the project consists of the erection of hoardings around the site, demolition of existing buildings, removal of existing overground and underground fuel tanks, incl any contaminated soil; all in preparation for the future development of the site.
Floor area stated for this source: 17,658 m².
The overall development consists of a new office building of six storeys (over basement); approx. 17,658 sq.m; this element of the project consists of the removal of asbestos material from the existing buildings on the site, in preparation for the future development of the site.
Floor area stated for this source: 17,658 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.