Commencement notice group

Commercial commencement notices — Dublin

Dublin 1, Dublin

1 unique commencement event · latest notified commencement 24 Jun 2025 · planning basis not stated

Unique commencement events
1
Latest notified commencement
24 Jun 2025
Latest notice
27,500 m²
Planning references supplied
None stated
Public location
Dublin 1, Dublin

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin 1, Dublin
County
Dublin

Notice location variants

  • Citibank HQ, North Wall Quay, Dublin 1 SN0012659DC
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

SN0012659DC BCMS open-data feed

Large commercial office fitout in new building. 10 Floors of interior office fitout. Levels: LG (Lower Ground); Level GF (Ground Floor) and Levels 01 – 08. Two basements are not part of the fitout works (level B1 and Level B2) at Citibank HQ, North Wall Quay, Dublin 1.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 27,500 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.