Commencement notice group
Phoenix park — commencement notices
Castleknock Road, Dublin
3 unique commencement events · latest notified commencement 24 Feb 2022 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 24 Feb 2022
- Latest notice
- 100 m²
- Planning references supplied
- FW16A/0100
- Public location
- Castleknock Road, Dublin
Public source geography
Site location
- Public site / locality
- Castleknock Road, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin, Dublin
- GROUND LEVEL
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Fit out of ground floor commercial retail unit, Unit 3, Abelard Square, Phoenix park avenue, Castleknock, Dublin 15.
Floor area stated for this source: 100 m².
Construction of 1 No. 5 storey Apartment Building (Block 7) and 1 No. 3-4 storey Apartment Building(Block 8)consisting of 26 No. Apartments in total, along with 1 No. 5 Storey Stair/Lift Block providing bridge link access to Blocks 7 & 8.
CONSTRUCTION OF 1 NO. 5-STOREY MIXED USE BUILDING (REFERED TO AS BLOCK 2) CONSISTING OF 27 NO. APARTMENTS & 4 NO. COMMERCIAL UNITS AT GROUND LEVEL.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.