Commencement notice group
Housing commencement notices — Balgriffin
Balgriffin, Dublin
5 separate notices · latest notified commencement 23 Jun 2021 · planning basis not stated
- Source notices
- 5
- Latest notified commencement
- 23 Jun 2021
- Latest notice
- 182 m²
- Planning references supplied
- None stated
- Public location
- Balgriffin, Dublin
Public source geography
Site location
- Public site / locality
- Balgriffin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin, Dublin
- Belmayne, Dublin
- Belmayne Avenue, Belmayne, Balgriffin, Dublin 13
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The proposed building will consist of a single storey building. The proposed building will house two classrooms with entrance hall and toilets.
182 m² · stated on this notice
The proposed building will consist of a single storey building. The proposed building will contain an SEN unit.
74 m² · stated on this notice
The proposed building will consist of a single storey building. The proposed building will contain five classrooms.
306 m² · stated on this notice
Construction of new building, consisting of 2 schools. A temporary Post Primary School by way of construction 3 No prefabricated buildings, Units S1,S2 & S3, and a primary school of 2 No prefabricated buildings, Units B1 and B2 on a defined site, enclosed within a 2.4 meter high welded mesh fence, with access gates, associated site works including provision of a new entrance, car parking, drop of area, hard surface play area and Landscaping.
1,362 m² · stated on this notice
Temporary primary and post primary schools accommodation comprising of 5 No. prefabricated buildings at Belmayne Avenue, Belmayne, Balgriffin, Dublin 13. The primary school will consist of 2 no. units (Unit B1:282.2m2 and Unit B2:181.7m2) and the post primary school will consist of 3 no. units (Unit S1:341.5ms, Unit S2:238.7m2 and Unit S3:318.2m2).
3 units · 1,362 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.