Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
1 separate notice · latest notified commencement 29 May 2023 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 29 May 2023
- Latest notice
- 32 units
- Planning references supplied
- 2280/21
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- ground floor level
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new residential development containing 32 No.1 bed/ 2 person dwellings units as well as a community facility at ground floor level. The development fronting on to Glin Grove is to be a 3 storeys in height. The development comprises of 12 No. own door maisonettes entered directly from outside the building at ground level. 20 No. apartments between at first and second floor, served by a single stair and accessed via an external deck. Community building (134 m2) at ground floor level, with kitchen, community room and associated facilities and ancillary spaces entered directly from outside the building at ground floor level.
32 units · 1,898 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.