Commencement notice group

Building extension commencement notices — Galway

Galway, Galway

1 unique commencement event · latest notified commencement 23 Sep 2024 · planning reference supplied

Unique commencement events
1
Latest notified commencement
23 Sep 2024
Latest notice
1 unit
Planning references supplied
2460073
Public location
Galway, Galway

Verified project chain

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Completion certificates are shown only after the official planning, commencement, certificate and PDF evidence chain passes; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Galway, Galway
County
Galway
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Galway City Council planning record Application details, status and decision record for 2460073. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0119539GY BCMS open-data feed

Permission for development which consists of the demolition of existing single storey side garage structure, construction of a new two storey side and rear extension, single storey rear extension, alterations to existing front elevations, internal alterations, and all ancillary site works.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 226 m².

Planning reference 2460073

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.