Commencement notice group

Housing commencement notices — Dublin

Dublin, Dublin

1 separate notice · latest notified commencement 03 Jun 2022 · planning reference supplied

Source notices
1
Latest notified commencement
03 Jun 2022
Latest notice
86 units
Planning references supplied
3826/19,3930/18ANDABP303146
Public location
Dublin, Dublin

Public source geography

Site location

Public site / locality
Dublin, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference3826/19,3930/18ANDABP303146

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0090080DC BCMS owner-supplied export

Construction of additional 15 no. apartment units on 3rd floor of Block 02 and Block 03 Brookwood Court, unit nos. 24 to 27 inclusive, 43 to 46 inclusive, 62 to 65 inclusive, 81 to 83 inclusive, Brookwood Court, St. Brigids Road, Killester, Dublin.

86 units · 1,056 m² · stated on this notice

Planning reference 3826/19,3930/18ANDABP303146 Builder stated: Clondev Properties Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.