Commencement notice group
St. Vincent's University Hospital campus — commencement notices
Dublin, Dublin
6 unique commencement events · latest notified commencement 26 Jun 2020 · planning basis not stated
- Unique commencement events
- 6
- Latest notified commencement
- 26 Jun 2020
- Latest notice
- 110 m²
- Planning references supplied
- None stated
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin 4, Dublin
- Elm Park, Dublin
- the existing St
- the existing St Vincent's University Hospital campus, Elm Park, Dublin 4
- ground level and level 5 at St Vincent’s University Hospital, Elm Park, Dublin 4
- the eastern end of the St
- 1 additional public site label
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Construction of a new electrical substation at the existing St. Vincent's University Hospital campus, Elm Park, Dublin 4.
Floor area stated for this source: 110 m².
Construction of a New Bike Store at the existing St. Vincent's University Hospital campus, Elm Park, Dublin 4.
Floor area stated for this source: 160 m².
Construction of a new manifold room at the existing St Vincent's University Hospital campus, Elm Park, Dublin 4.
Floor area stated for this source: 11 m².
Extension of the existing Multi-storey car park to serve the proposed National Maternity Hospital (NMH). The car park’s proposals include extending the existing car park levels and providing two new storeys above. The upper levels will be served by new stairs and lift cores. The car park will be entered by vehicles via two new entrances at ground level and level 5 at St Vincent’s University Hospital, Elm Park, Dublin 4.
Floor area stated for this source: 12,560 m².
The proposed development consists of a new 50,776sq.m. gross floor area building to be developed on a site at the eastern end of the St. Vincent’s University Hospital Campus adjacent to and connected with the St. Vincent’s Clinical Services Building. The proposed building will rise to five and six storeys plus additional plant areas at roof level over the prevailing ground level and a proposed basement. The new structure provides for the National Maternity Hospital to be relocated from Holles Street, Dublin 2.
Floor area stated for this source: 50,776 m².
Temporary Carpenters Workshop facility within the site of the existing Goods Delivery yard at St. Vincent’s University Hospital, Elm Park, Dublin 4.
Floor area stated for this source: 182 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.