Commencement notice group

St. Vincent's University Hospital campus — commencement notices

Dublin, Dublin

6 unique commencement events · latest notified commencement 26 Jun 2020 · planning basis not stated

Unique commencement events
6
Latest notified commencement
26 Jun 2020
Latest notice
110 m²
Planning references supplied
None stated
Public location
Dublin, Dublin

Public source geography

Site location

Public site / locality
Dublin, Dublin
County
Dublin

Public site labels seen across the notices

  • Dublin 4, Dublin
  • Elm Park, Dublin
  • the existing St
  • the existing St Vincent's University Hospital campus, Elm Park, Dublin 4
  • ground level and level 5 at St Vincent’s University Hospital, Elm Park, Dublin 4
  • the eastern end of the St
  • 1 additional public site label
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0065439DC BCMS owner-supplied export

Construction of a new electrical substation at the existing St. Vincent's University Hospital campus, Elm Park, Dublin 4.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 110 m².

CN0057611DC BCMS owner-supplied export

Construction of a New Bike Store at the existing St. Vincent's University Hospital campus, Elm Park, Dublin 4.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 160 m².

CN0050455DC BCMS owner-supplied export

Construction of a new manifold room at the existing St Vincent's University Hospital campus, Elm Park, Dublin 4.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 11 m².

CN0048432DC BCMS open-data feed

Extension of the existing Multi-storey car park to serve the proposed National Maternity Hospital (NMH). The car park’s proposals include extending the existing car park levels and providing two new storeys above. The upper levels will be served by new stairs and lift cores. The car park will be entered by vehicles via two new entrances at ground level and level 5 at St Vincent’s University Hospital, Elm Park, Dublin 4.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 12,560 m².

CN0046741DC BCMS open-data feed

The proposed development consists of a new 50,776sq.m. gross floor area building to be developed on a site at the eastern end of the St. Vincent’s University Hospital Campus adjacent to and connected with the St. Vincent’s Clinical Services Building. The proposed building will rise to five and six storeys plus additional plant areas at roof level over the prevailing ground level and a proposed basement. The new structure provides for the National Maternity Hospital to be relocated from Holles Street, Dublin 2.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 50,776 m².

CN0046712DC BCMS owner-supplied export

Temporary Carpenters Workshop facility within the site of the existing Goods Delivery yard at St. Vincent’s University Hospital, Elm Park, Dublin 4.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 182 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.