Commencement notice group

Housing commencement notices — Portan

Portan, Meath

4 unique commencement events · latest notified commencement 14 Jul 2021 · planning basis not stated

Unique commencement events
4
Latest notified commencement
14 Jul 2021
Latest notice
60 m²
Planning references supplied
None stated
Public location
Portan, Meath

Planning-anchored public geography

Site identity and location

Canonical public locality
Portan, Meath
County
Meath

Notice location variants

  • Clonee, Meath CN0078709MH, CN0054306MH
  • lands within the townlands of Portan, Gunnocks, Loughsallagh, and Clonee, Co Meath CN0078709MH
Location evidence needs care
  • Notice source points are up to 88.6 km apart, so no combined representative point is shown.

Source positions remain separate:

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0078709MH BCMS owner-supplied export

Construction of a security guard house with area of circa 60m2 serving a new data centre building at lands within the townlands of Portan, Gunnocks, Loughsallagh, and Clonee, Co Meath.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 60 m².

Builder stated: Mace Technology Ltd
CN0054322MH BCMS owner-supplied export

Bracetown Substation has three separate control buildings. These buildings are identified as the Eirgrid Control Building, Eirgrid Diesel Generator Building and Customer Control Building.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 609 m².

Builder stated: Gaeltec Utilities Ltd
CN0054306MH BCMS open-data feed

CLN5_6 Data Centre - Construction of two single-storey data centre buildings with a gross floor area (GFA) of circa 57,400m2; (b) A single storey administration / office building with a GFA of circa 5,710m2 which is physically linked to the proposed data centre buildings; (c) Site infrastructure to include entrance gates and appropriate signage

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 57,382 m².

CN0048692MH BCMS owner-supplied export

Works of an Enabling Nature consisting of removal of vegetation, topsoil and subsoil strip, placing stone fill over the site to allow access for construction. No Building Construction shall take place under this notice. Start of Foundations is anticpated for August 2019 for which a full CN will be issued.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 63,000 m².

Builder stated: Mace Technology Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.