Commencement notice group

Commencement notices — Cork

Cork

1 separate notice · latest notified commencement 12 May 2020 · planning reference supplied

Source notices
1
Latest notified commencement
12 May 2020
Latest notice
20,445 m²
Planning references supplied
19/06392
Public location
Cork

Public source geography

Site location

Public site / locality
Cork
County
Cork
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference19/06392

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0064070CC BCMS owner-supplied export

1 Cubicle shed with slatted tank 2 Walled silage pit and all associated works

20,445 m² · stated on this notice

Planning reference 19/06392 Builder stated: Dermot Kiely Construction Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.