Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
1 separate notice · latest notified commencement 20 Nov 2020 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 20 Nov 2020
- Latest notice
- 5 homes
- Planning references supplied
- D17A/0666
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of existing single- storey detached dwelling and outbuildings and construction of 5 no. two-storey, three- bedroom contemporary style dwellings (comprising 3 no. detached and 2 no. semi-detached dwellings); creation of 2 no. new vehicular entrances off the Old Kilgobbin Road to serve the 2 no. House Type A dwellings; creation of a new access road off the Old Kilgobbin Road to provide access to House Type B and C dwellings (3 no. in total); provision of 2 no. on-curtilage car parking spaces for each dwelling; private open space for each dwelling; SUDS drainage, boundary treatment, landscaping and all ancillary works necessary to facilitate the development.
5 homes · 3,175 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.