Commencement notice group
Orion Business Park — commencement notices
Dublin, Dublin
5 unique commencement events · latest notified commencement 02 Oct 2024 · planning reference supplied
- Unique commencement events
- 5 7 public source rows · 2 duplicate representation consolidated
- Latest notified commencement
- 02 Oct 2024
- Latest notice
- 941 m²
- Planning references supplied
- FW18A/0114
- Public location
- Dublin, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin, Dublin
- County
- Dublin
Notice location variants
- ballycoolin, Dublin 15, Dublin SN0011167FL, NBCO:SN0011167FL
- Orion Business Park, Ballycoolin, Dublin 15 SN0011167FL, SN0011166FL, NBCO:SN0011167FL, NBCO:SN0011166FL
- Orion Business Park, Ballycoolin, Dublin 15 for PURE DC DUB01 SN0007679FL, SN0007681FL
- Notice source points are up to 560 m apart, so no combined representative point is shown.
Source positions remain separate:
- SN0011167FL · 53.407273, -6.348547 Open point
- SN0011166FL · 53.407273, -6.348690 Open point
- NBCO:SN0011167FL · 53.407273, -6.348547 Open point
- NBCO:SN0011166FL · 53.407273, -6.348690 Open point
- SN0007679FL · 53.407426, -6.348959 Open point
- SN0007681FL · 53.410394, -6.355175 Open point
- CN0088221FL · 53.410394, -6.355175 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 2 duplicate source representations are consolidated under the canonical notice reference while every source remains visible beneath that event.
Proposed Construction of an Energy Centre (EC2) at Orion Business Park, Ballycoolin, Dublin 15.
Floor area stated for this source: 941 m².
- NBCO historical file · NBCO:SN0011167FL Notified commencement: 2024-10-02 Source checked: 2026-08-14T05:13:12Z Floor area stated in this source representation: 941 m² Open source record Open official source Open source location
- BCMS open-data feed · SN0011167FL Notified commencement: 2024-10-02 Source checked: 2026-06-09T15:11:14Z Floor area stated in this source representation: 941 m² Open source record Open official source Open source location
Proposed Construction of a 3 storey MV Building (MV2) at Orion Business Park, Ballycoolin, Dublin 15.
Floor area stated for this source: 602 m².
- NBCO historical file · NBCO:SN0011166FL Notified commencement: 2024-10-02 Source checked: 2026-08-14T05:13:12Z Floor area stated in this source representation: 602 m² Open source record Open official source Open source location
- BCMS open-data feed · SN0011166FL Notified commencement: 2024-10-02 Source checked: 2026-06-09T15:11:14Z Floor area stated in this source representation: 602 m² Open source record Open official source Open source location
Construction of an ESB Substation associated with Data Centre Building at Orion Business Park, Ballycoolin, Dublin 15 for PURE DC DUB01
Floor area stated for this source: 30 m².
Construction of a Guard House associated with Data Centre Building at Orion Business Park, Ballycoolin, Dublin 15 for PURE DC DUB01
Floor area stated for this source: 47 m².
Construction of a data centre with internal access roads, car parking for 30 no. spaces and all associated works.
Floor area stated for this source: 13 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.