Commencement notice group

Housing commencement notices — Ballybaan

Ballybaan, Galway

1 separate notice · latest notified commencement 07 Apr 2020 · planning reference supplied

Source notices
1
Latest notified commencement
07 Apr 2020
Latest notice
58 homes
Planning references supplied
LA1-2019
Public location
Ballybaan, Galway

Public source geography

Site location

Public site / locality
Ballybaan, Galway
County
Galway

Public site labels seen across the notices

  • Old Ballybaan Road, Ballybaan More, Galway
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning referenceLA1-2019

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0063346GY BCMS open-data feed

Construction of 58 Residential units and associated site works at Old Ballybaan Road, Ballybaan More, Galway. Mix of terraced and semi-detached units - 9 apts, 9 duplex, 40 houses.

58 homes · 319,580 m² · stated on this notice

Planning reference LA1-2019

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.