Commencement notice group
Housing commencement notices — Ayrfield
Ayrfield, Dublin
1 unique commencement event · latest notified commencement 19 Mar 2019 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 19 Mar 2019
- Latest notice
- 150 units
- Planning references supplied
- None stated
- Public location
- Ayrfield, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Ayrfield, Dublin
- County
- Dublin
Notice location variants
- roof level CN0049623DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Proposed residential development on 1.53 hectares of land to consist of : i) 150 no. apartment units and associated car parking comprising (a) 50 no. 1 bed units, (b) 81 no. 2 bed units and (c) 19 no. 3 bed units; (ii) 1 no. crèche facility of 594sqm with potential for community use until such time as crèche becomes viable; (iii) 3 no. office/commercial buildings with a total floor area of 152.6sqm with 1 no. of these units dedicated for community use; (iv) renewable energy design measures externally to the building at roof level; (v) 0.31 hectares of public open space with provision for a multi-use games area (MUGA) and perimeter fencing; (vi) temporary access from Belmayne Road until such a time as the adjoining residential development of Belmayne to the east has been taken in charge and access from Churchwell Avenue can be provided; (vii) ESB substation; (viii) temporary construction signage; (ix) estate signage; (x) site perimeter boundary treatment to the north and west with temporary fencing to the south until such a time as remainder of land is developed; and (xi) all associated site works. The height of the proposal ranges from 5 to 6 storeys to the west (Malahide Road); 4 to 5 storeys to the east; 4 to 6 storeys to the north; and 3 to 5 storeys to the south. Part of the development is over basement.
Floor area stated for this source: 19,359 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.