Commencement notice group
Housing commencement notices — Islandbridge
Islandbridge, Dublin
2 unique commencement events · latest notified commencement 15 Jul 2015 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 15 Jul 2015
- Latest notice
- 85 units
- Planning references supplied
- None stated
- Public location
- Islandbridge, Dublin
Public source geography
Site location
- Public site / locality
- Islandbridge, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The development comprises of the redevelopment of the former Clancy Military Barracks to provide 163 no. residential units in two phases. This phase 2.2, comprises of 85 no. units. 51 no. units in this phase will be new-build units. The remaining 34 no. units in this phase will be accommodated within the existing Military Buildings. Consequently the existing Military Buildings will be conserved, rehabilitated and refurbished (including partial demolition of some elements). This phase includes The following Blocks B1, B2, C2, C3 and Blocks L1 & L2 which are Apartment housing. The provided accommodation consists of the following; 19 No. 1 Bed Apartments, 34 No. 2 Bed Apartments, 7 No. 2 Bed Houses, 4 No. 3 Bed Apartments, 18 No 3 Bed Houses, 1 No. 4 Bed House
The development comprises of the redevelopment of the former Clancy Military Barracks to provide 163 no. residential units in two phases. This phase 2.1, comprises of 78 no. units. 35 no. units in this phase will be new-build units. The remaining 43 no. units in this phase will be accommodated within the existing Military Buildings. Consequently the existing Military Buildings will be conserved, rehabilitated and refurbished (including partial demolition of some elements. This phase includes The following Blocks B3, B5, B6, B7, B8, B9 and courtyard housing. The provided accommodation consists of the following; 14 No. 1 Bed Apartments 3 No. 1 Bed Houses 32 No. 2 Bed Apartments 12 No. 2 Bed Houses 4 No. 3 Bed Apartments 7 No 3 Bed Houses 6 No. 4 Bed Houses
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.