Commencement notice group
Housing commencement notices — Cork
Cork, Cork
1 separate notice · latest notified commencement 03 Aug 2018 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 03 Aug 2018
- Latest notice
- 47 units
- Planning references supplied
- P8.CNWQR.05
- Public location
- Cork, Cork
Public source geography
Site location
- Public site / locality
- Cork, Cork
- County
- Cork
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consists of the construction of 47 No. new residential units on a site which is in the ownership of Cork City Council. The proposed development will be Phase 2A of the City North West Quarter Regeneration (CNWQR) Master Plan, Knocknaheeny, Cork. The proposed development will comprise of the following: • 2 No. 3 storey, 3 bed, end of terrace dwellings. • 9 No. 3 storey, 3 bed, mid terrace dwellings. • 8 No. 2 storey, 3 bed, end of terrace dwellings. • 11 No. 2 storey, 3 bed, mid terrace dwellings. • 2 No. 2 storey, 3 bed, semi-detached dwellings. • 15 No. 2 bedroom apartments (5 No. 3 storey corner apartment buildings, consisting of 2 bed apartments on each floor).
47 units · 4,089 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.