Commencement notice group
Housing commencement notices — Limerick
Limerick, Limerick
3 unique commencement events · latest notified commencement 10 May 2021 · planning basis not stated
- Unique commencement events
- 3
- Latest notified commencement
- 10 May 2021
- Latest notice
- 14 houses
- Planning references supplied
- None stated
- Public location
- Limerick, Limerick
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Limerick, Limerick
- County
- Limerick
- Notice source points are up to 5.0 km apart, so no combined representative point is shown.
Source positions remain separate:
- CN0075449LL · 52.644720, -8.617317 Open point
- CN0075150LL · 52.682020, -8.641832 Open point
- CN0075079LL · 52.682433, -8.656641 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Construction of 14 Dwelling Units in Carew Park, Southill, Limerick
Floor area stated for this source: 930 m².
Construction of 4 Dwelling Units in Hartigan Villas, Moyross Limerick
Floor area stated for this source: 354 m².
Construction of 20 Dwelling Units in Delmege Park, Moyross Limerick as part of Emergency planning for 40no units to Moyross and Southill for Peter McVerry Trust.
Floor area stated for this source: 1,861 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.