Commencement notice group

Commercial commencement notices — Parkmore East

Parkmore East, Galway

1 unique commencement event · latest notified commencement 26 Sep 2022 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
26 Sep 2022
Latest notice
7,051 m²
Planning references supplied
20/1061
Public location
Parkmore East, Galway

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
1
  1. Completion certificate recorded — source scope not stated Galway County Council · commencement CN0093907GC Certificate CC00000049828GC · First observed in the official monthly source 2022-09 5 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Parkmore East, Galway
County
Galway

Notice location variants

  • a site of c CN0093907GC
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Galway County Council planning record Application details, status and decision record for 20/1061. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0093907GC BCMS open-data feed

Development for a medical devices manufacturing and research and development facility at a site of c. 6.497 ha. The development will consist of a two storey building, comprising manufacturing floorspace [10,610 sq. m], associated office floorspace [2445 sq. m] and ancillary facilities arranged over ground and first floor levels and one storey utility buildings, including plant rooms [including ESB substation], chemical storage, water pump room, sprinkler pump room and a security cabin and other external plant and equipment. The development will consist of an access road, including a roundabout, providing access from Parkmore Road [via the existing Parkmore East Business Park internal roads], signage, a marshalling yard, surface car and bicycle parking, waste storage, hard and soft landscaping, boundary treatment, piped infrastructure and ducting and all site development and excavation works above and below ground. The proposed development has a total gross internal floor area of 13, 656 msq which includes utility buildings of 61 msq. Gross floor space of proposed works: 13,656 msq.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 7,051 m².

Planning reference 20/1061

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.