2 unique commencement events · latest notified commencement 26 Nov 2020 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 26 Nov 2020
- Latest notice
- 5 units
- Planning references supplied
- ABP-305309-19
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-305309-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Demolition of three-storey detached dwelling (297 sqm) and associated outbuildings. 2. Construction of 5 no. terraced, three bedroom, three storey pitched roof dwelling houses. 3. Construction of 9 no. apartments in a four storey building (consisting of 2 no. one bedroom units, 6 no. two bedroom units and 1 no. three bedroom penthouse). 4. 20 no. surface car parking spaces and private amenity open space to each dwelling and landscaped amenity open space for apartments. 5. Extinguish existing vehicular entrance on Priory Avenue and replace with pedestrian only entrance. 6. New vehicular and pedestrian entrance on Grove Avenue. 7. New public footpath along Grove Avenue. 8. Landscaping, tree planning and boundary treatments and associated works. 9. SuDS surface water drainage, foul water potable water connections. 10. All ancillary works necessary to facilitate the development.
Floor area stated for this source: 978 m².
1. Demolition of three-storey detached dwelling (297 sqm) and associated outbuildings. 2. Construction of 5 no. terraced, three bedroom, three storey pitched roof dwelling houses. 3. Construction of 9 no. apartments in a four storey building (consisting of 2 no. one bedroom units, 6 no. two bedroom units and 1 no. three bedroom penthouse). 4. 20 no. surface car parking spaces and private amenity open space to each dwelling and landscaped amenity open space for apartments. 5. Extinguish existing vehicular entrance on Priory Avenue and replace with pedestrian only entrance. 6. New vehicular and pedestrian entrance on Grove Avenue. 7. New public footpath along Grove Avenue. 8. Landscaping, tree planning and boundary treatments and associated works. 9. SuDS surface water drainage, foul water potable water connections. 10. All ancillary works necessary to facilitate the development.
Floor area stated for this source: 1,059 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.