Commencement notice group

Housing commencement notices — Limerick

Limerick, Limerick

1 separate notice · latest notified commencement 03 Sep 2020 · planning basis not stated

Source notices
1
Latest notified commencement
03 Sep 2020
Latest notice
5 units
Planning references supplied
None stated
Public location
Limerick, Limerick

Public source geography

Site location

Public site / locality
Limerick, Limerick
County
Limerick
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

SN0005508LL BCMS open-data feed

Making good of roofing finishes on main building;Making good of chimneys shared with the adjacent building;Restoration of rainwater goods; Making good of internal plasters as necessary; Making good of flooring joists and finishes as necessary; Conservation of rise-and fall box-framed sash windows as necessary; Making good pointing to include wigging, window reveals and repainting of same; Fitting out as good quality single-bed apartments to include internal alterations to plan form; Construction of inserted fire proofing ceiling beneath existing lath and plaster finishes; Installation of appropriate fire saftey measures to include fire alarm, emergency lighting, and automatic opening vent; Ancillary works to acheive above.

5 units · 283 m² · stated on this notice

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.