Commencement notice group
Commencement notices — Wexford
Wexford, Wexford
2 separate notices · latest notified commencement 29 Jun 2020 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 29 Jun 2020
- Latest notice
- 198 m²
- Planning references supplied
- LAC1903
- Public location
- Wexford, Wexford
Public source geography
Site location
- Public site / locality
- Wexford, Wexford
- County
- Wexford
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The works consists of the construction of a two storey timber framed building on a brown field site in Wexford Town. The building, approximately 200m2, will comprise of counselling rooms with administration and ancillary spaces, with two walled exterior spaces and 3no. car parking spaces. A number of external retaining walls, external paths & steps, and landscaped areas, form part of the works.
198 m² · stated on this notice
Existing vehicular entrance adjusted, existing gravel road realigned and upgraded to a tarmac road. New public footpath to be installed along new road. Existing underground services to be diverted, and additional services to be installed under new road and path to service two future development sites; including power, telecom, data, public lighting and mains water. New manholes and drainage runs to connect into existing foul and surface water drainage lines on site.
Scale not stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.