Commencement notice group
Housing commencement notices — Clongriffin
Clongriffin, Dublin
9 unique commencement events · latest notified commencement 10 Jun 2016 · planning basis not stated
- Unique commencement events
- 9
- Latest notified commencement
- 10 Jun 2016
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- Clongriffin, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Clongriffin, Dublin
- County
- Dublin
Notice location variants
- Belltree Blocks 16-19, the construction of 24 no CN0017044DC
- Belltree Blocks 9-15, the construction of the superstructure and completion of 35 no CN0013621DC
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
At Belltree Blocks 16-19, the construction of 24 no. houses in 4 no. terraces. 13 houses are three-storey while 11 are two- storey. All are of masonry construction with concrete ground floors and tiled pitched roofs.
Source unit value with scope not stated: 24 houses. It is not presented as notice-specific scale.
At Belltree Blocks 9-15, the construction of the superstructure and completion of 35 no. houses in 7 no. terraces. 15 houses are three-storey while 20 are two-storey. All are of masonry construction with concrete ground floors and tiled pitched roofs.
The construction of the substructure and siteworks of 35 no. houses in 7 no. terraces. 15 houses are three-storey while 20 are two-storey. All are of masonry construction with concrete ground floors and tiled pitched roofs
The construction of the superstructure and completion of a terrace of 9 no. three-storey houses and 1 no. detached two-storey house. All are of masonry construction with concrete ground floors and tiled pitched roofs.
The construction of the superstructure and completion of 26 no. houses in 5 no. terraces. 13 no. houses will be 2-storey and 13 no. will be 3-storey (i.e. 2-storey plus dormer room-in-roof). All are of masonry construction with concrete ground floors and tiled pitched roofs.
The construction of the substructure and siteworks of a terrace of 9 no. three-storey houses and 1 no. detached two-storey house. All are of masonry construction with concrete ground floors and tiled pitched roofs.
The construction of the substructure and siteworks of 26 no. houses in 5 no. terraces. 13 no. houses will be 2-storey and 13 no. will be 3-storey (i.e. 2-storey plus dormer room-in-roof). All are to be masonry clad timber frame with concrete ground floors and tiled pitched roofs.
The construction of the Superstructure & Completion of one terrace of four houses. 3 no. houses will be two-storey and 1 no. house will be three-storey (i.e. 2-storey plus dormer room-in-roof). All are to be masonry clad timber frame with concrete ground floors and tiled pitched roofs.
The construction of the substructure and siteworks of one terrace of four houses. 3 no. houses will be two-storey and 1 no. house will be 3-storey (i.e. 2-storey plus dormer room-in-roof). All are to be masonry clad timber frame on concrete ground floors with tiled pitched roofs.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.