Commencement notice group
Commencement notices — Dublin
Dublin, Dublin
1 unique commencement event · latest notified commencement 20 Dec 2021 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 20 Dec 2021
- Latest notice
- 102 units
- Planning references supplied
- ABP-305659-19
- Public location
- Dublin, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-305659-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Works in advance of the construction of a new building at 3 Ardee Road, Rathmines, Dublin 6 to include the following: Demolition of all existing buildings on the existing site (all buildings are detached from neighbouring properties), grubbing up of all hard-standings, erection of hoarding, investigating and marking of existing underground services, setting out the building footprint and setting up the site compound, all at 3 Ardee Road, Rathmines, Dublin.
Floor area stated for this source: 764 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.