Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
1 unique commencement event · latest notified commencement 13 Aug 2018 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 13 Aug 2018
- Latest notice
- 8,496 m²
- Planning references supplied
- D17A/0435
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- fourth floor
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Ballymoss House is an existing office building in Sandyford comprising four storeys of office accommodation over a basement car park, with plant accommodation located at fourth floor. It is proposed to enclose the central courtyard in the building to form an atrium and to carry out material alterations to other areas in the building. The material alterations include new changing facilities at basement, a stair connecting basement and ground, and alterations to the toilet facilities on upper floors.
Floor area stated for this source: 8,496 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.