Commencement notice group

Building extension commencement notices — Dublin

Dublin, Dublin

1 unique commencement event · latest notified commencement 05 Nov 2024 · planning reference supplied

Unique commencement events
1
Latest notified commencement
05 Nov 2024
Latest notice
43,060 m²
Planning references supplied
D24A/0193
Public location
Dublin, Dublin

Public source geography

Site location

Public site / locality
Dublin, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0121419DR BCMS owner-supplied export

The removal of the existing side garage and the construction of a two storey side extension. the construction of a single sto9rey rear extension, The widening of the vehicular front access and all site ancillary works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 43,060 m².

Planning reference D24A/0193 Builder stated: JSPM Propono Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.