Commencement notice group
Building extension commencement notices — Galway
Galway, Galway
1 separate notice · latest notified commencement 28 Dec 2021 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 28 Dec 2021
- Latest notice
- 2,222 m²
- Planning references supplied
- 21/228
- Public location
- Galway, Galway
Public source geography
Site location
- Public site / locality
- Galway, Galway
- County
- Galway
Public site labels seen across the notices
- St
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Galway City Council · reference 21/228 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
This project involves localised renovation and upgrade works to Coláiste Muire Mháthair (Formerly St. Mary's College) at St. Mary's Road, Galway. The works include internal renovations within existing Main School Building for the provision of additional General Classrooms, Specialist Rooms, WC facilities, and selected localised internal demolition works. Works also include demolition of existing Part-M entrance lobby (9.3m2) and construction of a new Part-M lobby (23.1m2) extension in the same location, and a further 5.6m2 extension to provide universal access off Central Courtyard. Works also include selected Universal Access and Fire Safety upgrades, as well as selected ancillary siteworks. Proposed development will be carried out within the confines of and within the curtilage of protected structures: RPS No.9801 (referenced St. Mary's College Educational Buildings & Chapel)
2,222 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.