Commencement notice group
Housing commencement notices — Limerick
Limerick, Limerick
1 separate notice · latest notified commencement 19 Nov 2018 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 19 Nov 2018
- Latest notice
- 5 units
- Planning references supplied
- 13770161
- Public location
- Limerick, Limerick
Public source geography
Site location
- Public site / locality
- Limerick, Limerick
- County
- Limerick
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The change of use of Shelburne House as a single dwelling unit, to 5 no. apartment units, the construction of return building at basement, ground and first floor levels, similar to that previously demolished under planning ref 09142, the construction of hardstanding vehicle parking areas, foul and storm sewer connections, water supply connections and all ancillary works
5 units · 842 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.