Commencement notice group
Housing commencement notices — Cork
Cork, Cork
1 separate notice · latest notified commencement 27 Feb 2023 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 27 Feb 2023
- Latest notice
- 38 units
- Planning references supplied
- P8.CNWQR.18.07
- Public location
- Cork, Cork
Public source geography
Site location
- Public site / locality
- Cork, Cork
- County
- Cork
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
This site is part of Cork City North West Regeneration (Phase 2B). It is adjacent Harbour View Road and consists of the construction of 38 housing units, an arterial road and associated infrastructure. The 38 no. dwelling units consist of 21 no. 2 storey/ 3 storey houses and 17 no. apartments, as follows: Unit A20 3 bedroom 3 storey house End of Terrace Unit A21 3 bedroom 3 storey house Mid Terrace Unit A22 3 bedroom 3 storey house End of Terrace Unit A23 3 bedroom 3 storey house End of Terrace Unit A24 3 bedroom 3 storey house Mid Terrace Unit A25 3 bedroom 3 storey house Mid Terrace Unit A26 3 bedroom 3 storey house Mid Terrace Unit A27 3 bedroom 3 storey house Mid Terrace Unit A28 3 bedroom 3 storey house Mid Terrace Unit A29 3 bedroom 3 storey house Mid Terrace Unit A30 3 bedroom 3 storey house End of Terrace Unit B6 3 bedroom 2 storey house Semi Detached Unit B7 3 bedroom 2 storey house Semi Detached Unit D3 3 bedroom 3 storey house Semi Detached Unit D4 4 bedroom 3 storey house Semi Detached Unit D5 4 bedroom 3 storey house Semi Detached Unit D6 3 bedroom 3 storey house Semi Detached Unit E1 3 bedroom 2 storey house Detached Unit E2 3 bedroom 2 storey house Detached Unit E3 3 bedroom 2 storey house Semi Detached Unit E4 3 bedroom 2 storey house Semi Detached\ Unit C16 2 bedroom ground floor apartment Unit C17 2 bedroom first floor apartment Unit C18 2 bedroom second floor apartment Unit F1 2 bedroom ground floor apartment Unit F2 2 bedroom first floor duplex Unit F3 2 bedroom first floor duplex Unit F4 2 bedroom ground floor apartment Unit F5 2 bedroom first floor duplex Unit F6 2 bedroom first floor duplex Unit G1 2 bedroom ground floor apartment Unit G2 2 bedroom first floor duplex Unit G3 2 bedroom first floor duplex Unit H1 2 bedroom ground floor apartment Unit H2 2 bedroom first floor apartment Unit H3 2 bedroom second floor apartment Unit H4 2 bedroom first floor apartment Unit H5 2 bedroom ground floor apartment The units are to be constructed in tradit
38 units · 19,235 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.