Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
2 unique commencement events · latest notified commencement 08 Apr 2019 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 08 Apr 2019
- Latest notice
- 7,090 m²
- Planning references supplied
- FW17A/0154
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dunsinea Lane, Rathborne, Ashtown, Dublin 15
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new residential care home (nursing home) at Dunsinea Lane, Rathborne, Ashtown, Dublin 15. The development will consist of a two- storey building comprising 120 no. bedrooms with all associated ancillary offices, welfare spaces, access facilities and utilities.
Floor area stated for this source: 7,090 m².
Provision of road upgrades to Dunsinea Lane to include ramps and footways with associated drainage and watermain infrastructure, pump station compound and associated underground tank, Tolka bridge upgrade works to include parapet improvements and a new footway and kerbing, construction of new Toucan crossing signals on River Road, with new road line marking and signage to River Road and Dunsinea Lane.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.