Commencement notice group
Bush Post Primary School and ancillary works — commencement notices
Louth
2 separate notices · latest notified commencement 23 Dec 2021 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 23 Dec 2021
- Latest notice
- 3,135 m²
- Planning references supplied
- 181023
- Public location
- Louth
Public source geography
Site location
- Public site / locality
- Louth
- County
- Louth
Public site labels seen across the notices
- seecrin, Louth
- Bush Post Primary School and ancillary works
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Louth County Council · reference 181023 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(a) partial demolition of existing school including detached external store, permanent teaching structure and temporary teaching structures (b) construction of new two storey extension which will include Home Economics, Science, Art and general classrooms along with Special Needs Unit, offices, toilets and ancillary stores (c) extension to include roof mounted photovoltaic panels (d) provision of new onsite ESB substation structure (e) provision of new on site proprietary waste water treatment system with 24 hour storage (15.2m3) and sand polishing filter (400m2) (f) modifications to existing school elevation forming new general classroom space (g) modifications to existing front boundary including width increase of both existing site entrances (h) adjustment to existing bus set down to front of school (i) reconfiguration of existing onsite parking and provision of new staff parking areas with onsite visitor set down and parking facilities (j) the site is the subject of a hydrological assessment (k) and all ancillary site works.
3,135 m² · stated on this notice
Construction of 3 no Detached Single Storey Classrooms at Bush Post Primary School and ancillary works
49 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.