GrantedDecision recorded

~1 dwelling, 97, St John's Wood, Clondalkin, Dublin 22, D22 XY97

Dublin 22, Dublin · South Dublin County Council · Plan SD25B/0232W · PB ref PB-10000405568

The development will consist of Extension and refurbishment of existing dwelling to include construction of single-storey extensions to front and rear, alterations to roof to include dormer roof structure to rear of existing roof to create new storage space in attic, new roof light windows to front of roof, alterations to...

Indicative value €250k–500k PB indicative band
Units applied for 1 public application record
Floor area 25 m² published reliable figure
Decision 17 Jun 2025 public planning date
Commenced 12 Feb 2026 public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Site activity evidenced

A linked public commencement record can signal site-stage demand. It does not confirm that any package remains unawarded or publish a procurement date.

12 Feb 2026 / CN0138466SD / Confidence: Medium
Decision GRANT PERMISSION

Decision date 17 Jun 2025.

Open evidence
Commencement activity Official activity indexed

12 Feb 2026 / CN0138466SD

High for recorded activity
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

The development will consist of Extension and refurbishment of existing dwelling to include construction of single-storey extensions to front and rear, alterations to roof to include dormer roof structure to rear of existing roof to create new storage space in attic, new roof light windows to front of roof, alterations to existing internal layout, alterations to front, side and rear elevations and all associated site works. The development is proposed to be completed in phases as follows (1) The rear extension...

Ref SD25B/0232W Source-linked Official application description for exact planning reference SD25B/0232W
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
South Dublin County Council
Exact reference
SD25B/0232W
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
One-off house

One-off house - 1 dwellings

The public application record identifies 1 dwellings in the submitted planning scope.

SD25B/0232WExplicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

The development will consist of Extension and refurbishment of existing dwelling to include construction of single-storey extensions to front and rear, alterations to roof to include dormer roof structure to rear of existing roof to create new storage space in attic, new roof light windows to front of roof, alterations to existing internal layout, alterations to front, side and rear elevations and all associated site works. The development is proposed to be completed in phases as follows (1) The rear extension (2) The Dormer Roof Space (3) Alterations and extension to the front of the dwelling.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced 12 Feb 2026 CN0138466SD
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale SD25B/0232W

The development will consist of Extension and refurbishment of existing dwelling to include construction of single-storey extensions to front and rear, alterations to roof to include dormer roof structure to rear of existing roof to create new storage space in attic, new roof light windows to front of roof, alterations to existing internal layout, alterations to front, side and rear elevations and all associated site works. The development is proposed to be completed in phases as follows (1) The rear extension (2) The Dormer Roof Space (3) Alterations and extension to the front of the dwelling.

AuthoritySouth Dublin County Council
ReferenceSD25B/0232W
StatusChecked 2 Jun 2026
Open official record