~3 dwellings, Island Macloughry, Listowel, Co. Kerry
Development works within the site of their existing processing facility at Island Macloughry, Listowel, Co. Kerry comprising works associated with an upgrade to air and noise emission abatement systems for existing process dryers: (i) the installation of 3 no. external filter units comprising profiled metal clad structures...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A linked public commencement record can signal site-stage demand. It does not confirm that any package remains unawarded or publish a procurement date.
11 Mar 2026 / CN0139417KY / Confidence: MediumDecision date 28 May 2024.
11 Mar 2026 / CN0139417KY
High for recorded activityNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Development works within the site of their existing processing facility at Island Macloughry, Listowel, Co. Kerry comprising works associated with an upgrade to air and noise emission abatement systems for existing process dryers: (i) the installation of 3 no. external filter units comprising profiled metal clad structures with an overall height of c. 16.1m above existing yard level and including associated plant, duct work and stacks; (ii) construction of new profiled metal clad building enclosure, located...
Named firms
Public source roles
- Kerry Ingredients (Ireland) Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kerry County Council
- Exact reference
- 2460109
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Small residential - 3 dwellings
The public application record identifies 3 dwellings in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Kerry Ingredients (Ireland) Ltd
- Planning agent
- Kevin Harty
- Agent address
- 4 Day Place Tralee Co. Kerry V92 AW26
More Kerry planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Development works within the site of their existing processing facility at Island Macloughry, Listowel, Co. Kerry comprising works associated with an upgrade to air and noise emission abatement systems for existing process dryers: (i) the installation of 3 no. external filter units comprising profiled metal clad structures with an overall height of c. 16.1m above existing yard level and including associated plant, duct work and stacks; (ii) construction of new profiled metal clad building enclosure, located adjacent to the filters, to accommodate ancillary equipment and a new enclosed staircase to facilitate access to the upper level of the filters and ductwork; (iii) new profiled metal clad building enclosure to provide ladder access and facilitate material transfers to upper level of the filters; (iv) erection of 3m high acoustic panelled screen fencing; (v) new above roof ductwork and associated support framework over the roof of the existing process building to facilitate the ducting of the exhaust air from the existing dryers to the new filters; (vi) completion of associated siteworks including roads, pathways and drainage; and (vii) removal of the 3 no. redundant exhaust stacks from the roof of the existing process building following the commissioning of the new filters. This site facilitates activity in respect of which an EPA Industrial Emissions (IE) Licence Reg. No. P0393-03 is held by the Applicant.
Application to site progress
-
Applied 23 Feb 2024 2460109
-
Decision Conditional 28 May 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced 11 Mar 2026 CN0139417KY
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460109
Development works within the site of their existing processing facility at Island Macloughry, Listowel, Co. Kerry comprising works associated with an upgrade to air and noise emission abatement systems for existing process dryers: (i) the installation of 3 no. external filter units comprising profiled metal clad structures with an overall height of c. 16.1m above existing yard level and including associated plant, duct work and stacks; (ii) construction of new profiled metal clad building enclosure, located adjacent to the filters, to accommodate ancillary equipment and a new enclosed staircase to facilitate access to the upper level of the filters and ductwork; (iii) new profiled metal clad building enclosure to provide ladder access and facilitate material transfers to upper level of the filters; (iv) erection of 3m high acoustic panelled screen fencing; (v) new above roof ductwork and associated support framework over the roof of the existing process building to facilitate the ducting of the exhaust air from the existing dryers to the new filters; (vi) completion of associated siteworks including roads, pathways and drainage; and (vii) removal of the 3 no. redundant exhaust stacks from the roof of the existing process building following the commissioning of the new filters. This site facilitates activity in respect of which an EPA Industrial Emissions (IE) Licence Reg. No. P0393-03 is held by the Applicant.
Open official record