GrantedDecision recorded

Infrastructure, former Cemex site at Maudlins roundabout, Dublin Road Link with...

Naas, Kildare · Kildare County Council · Plan 2460574 · PB ref PB-10000465665

For demolition of all existing buildings on the site (c.9,949sq.m) and north and north-western boundary wall. Provision of new Electric Vehicle Charging Hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. EV bus/HGV charging spaces. Construction of 8 no. buildings (total gfa 10,527.59sq.m) as follows...

Indicative value €10m–30m PB indicative band
Units applied for Not listed public application record
Floor area 9,384 m² published reliable figure
Decision 7 Mar 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 7 Mar 2025. / Confidence: Low
Decision CONDITIONAL

Decision date 7 Mar 2025.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

For demolition of all existing buildings on the site (c.9,949sq.m) and north and north-western boundary wall. Provision of new Electric Vehicle Charging Hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. EV bus/HGV charging spaces. Construction of 8 no. buildings (total gfa 10,527.59sq.m) as follows: Distribution centre: single storey structure including offices (gross floor area 9,383.85sq.m) with a maximum height of 19.5m. It includes 13 no. loading bays, Service station – single...

Ref 2460574 Source-linked Official application description for exact planning reference 2460574

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Kildare County Council
Exact reference
2460574
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

2460574Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2460574Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2460574Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

For demolition of all existing buildings on the site (c.9,949sq.m) and north and north-western boundary wall. Provision of new Electric Vehicle Charging Hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. EV bus/HGV charging spaces. Construction of 8 no. buildings (total gfa 10,527.59sq.m) as follows: Distribution centre: single storey structure including offices (gross floor area 9,383.85sq.m) with a maximum height of 19.5m. It includes 13 no. loading bays, Service station – single storey building (759.5sq.m) including net retail area of 99.7sq.m, 3 no. food offers, seating area, drive-thru hatch, toilets, back of house area and external storage compound. The maximum height is 8.55m high. Drive-thru café – single storey building (256.70 sq.m) including kitchen, back of house, seating area and drive-thru hatch. The maximum height will be 6.24m. Substation (gfa 33.54sq.m). External generator (gfa 37.58sq.m) Service compound (gfa 37.58sq.m) Water pump house (gfa 12sq.m) Refuse compound (gfa 6.84sq.m) There will be signage on the distribution centre, service station and drive-thru café buildings. Free standing signage is also proposed within the site and a totem sign measuring 17.5m high and an information sign measuring 6.8m high at the perimeter of the site. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, HGV fuel pumps (5.6m high), modified vehicular entrance off Maudlins roundabout, replacement entrance off Johnstown Road with new slip lane, new spine road, car parking (169 – including EV parking and accessible spaces), cycle parking (46) with canopy over (3.1m high), HGV/Bus parking (16 no. – including 8 no. EV parking spaces, HGV only parking 3 no.), drainage infrastructure, boundary treatments, hard and soft landscaping (including detention basins), internal roads, footpaths and cycle lanes, outdoor exercise areas, outdoor eating/picnic areas, covered smoking area, overground tank, roof mounted solar panels, new internal roundabout junction, internal control sliding gate, underground fire water storage tank and lighting. All associate site works. The proposed development also includes works on lands in the ownership of Kildare County Council as part of the Key development Area Master Plan and Access Strategy agreed with Kildare County Council, to include: 1. Provision of a left slip lane from the R445 (Dublin Road) to the Monread Road at the Dublin Road Roundabout

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2460574

For demolition of all existing buildings on the site (c.9,949sq.m) and north and north-western boundary wall. Provision of new Electric Vehicle Charging Hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. EV bus/HGV charging spaces. Construction of 8 no. buildings (total gfa 10,527.59sq.m) as follows: Distribution centre: single storey structure including offices (gross floor area 9,383.85sq.m) with a maximum height of 19.5m. It includes 13 no. loading bays, Service station – single storey building (759.5sq.m) including net retail area of 99.7sq.m, 3 no. food offers, seating area, drive-thru hatch, toilets, back of house area and external storage compound. The maximum height is 8.55m high. Drive-thru café – single storey building (256.70 sq.m) including kitchen, back of house, seating area and drive-thru hatch. The maximum height will be 6.24m. Substation (gfa 33.54sq.m). External generator (gfa 37.58sq.m) Service compound (gfa 37.58sq.m) Water pump house (gfa 12sq.m) Refuse compound (gfa 6.84sq.m) There will be signage on the distribution centre, service station and drive-thru café buildings. Free standing signage is also proposed within the site and a totem sign measuring 17.5m high and an information sign measuring 6.8m high at the perimeter of the site. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, HGV fuel pumps (5.6m high), modified vehicular entrance off Maudlins roundabout, replacement entrance off Johnstown Road with new slip lane, new spine road, car parking (169 – including EV parking and accessible spaces), cycle parking (46) with canopy over (3.1m high), HGV/Bus parking (16 no. – including 8 no. EV parking spaces, HGV only parking 3 no.), drainage infrastructure, boundary treatments, hard and soft landscaping (including detention basins), internal roads, footpaths and cycle lanes, outdoor exercise areas, outdoor eating/picnic areas, covered smoking area, overground tank, roof mounted solar panels, new internal roundabout junction, internal control sliding gate, underground fire water storage tank and lighting. All associate site works. The proposed development also includes works on lands in the ownership of Kildare County Council as part of the Key development Area Master Plan and Access Strategy agreed with Kildare County Council, to include: 1. Provision of a left slip lane from the R445 (Dublin Road) to the Monread Road at the Dublin Road Roundabout

AuthorityKildare County Council
Reference2460574
StatusChecked 2 Jun 2026
Open official record