Major Project IntelligenceLinked commencement notices reviewed against the controlling planning scope.
Radharc Na Sleibhte, Mountrath
Scope check: planning findings are not automatically phase-specific, and delivery status is not stated.
Supplier-relevant findings are limited to exact official PDF pages, sections and drawings. Planning and commencement evidence remain separate.
Scope check - read before pricing
Evidence-backed packages
Package signals with public-source support
Watermain and utility works
The water system proposes a 100 mm HDPE primary main, 25 mm dwelling supply pipes, and Talbot Matrix-type boundary boxes.
Surface-water and SuDS
Each dwelling is proposed to have permeable front paving, with road and dwelling overflow routed to an infiltration basin and controlled public-network discharge.
Site infrastructure
A-Rated New Homes Ltd applied for 44 dwellings: 4 two-bed semi-detached, 12 three-bed terraced, and 28 three-bed semi-detached homes.
+3 further evidenced packages
PDF page 10; Printed page 10; Foul Drainage Application scope
PDF page 1; Landscape Masterplan; job 1880; drawing 01; revision C dated 13/11/2024; scale 1:500 Application scope
PDF page 6; Printed page 6; Surface Water Policy; project 6637 Application scope
Only packages with explicit public-source support are shown. No generic trade tags are added.
Project-scope facts
Context that frames the packages
Permission and notice scope
The official permission records 44 residential units. Linked notices cover 19 stated units.
Source-aware chronology
Planning and commencement evidence kept separate
Planning and final grant
Controlling application chronology
- 2460714Application receipt date recorded in the final-grant document.
- 2460714Final grant records 44 residential units.
Official commencement notices
Notice coverage kept separate from planning scope
- CN0141598LSConstruction of 19 dwellings and associated site works.
Evidence register
Accessible source rows
- Reference
- 2460714
- Locator
- PDF page 2; Section 9 Description of Proposed Development
- Reviewed
- 13 Jul 2026
A-Rated New Homes Ltd applied for 44 dwellings: 4 two-bed semi-detached, 12 three-bed terraced, and 28 three-bed semi-detached homes.
Planning-stage evidence; implementation status is not stated.
- Reference
- 2460714
- Locator
- PDF page 6; Printed page 6; Surface Water Policy; project 6637
- Reviewed
- 13 Jul 2026
The existing surface-water network is described as discharging runoff to a 360 cubic metre offline attenuation tank, with short events infiltrated on site and longer events routed through a detention basin.
The report describes network design and does not confirm tank ownership, installation status, or spare capacity.
- Reference
- 2460714
- Locator
- PDF page 1; Landscape Masterplan; job 1880; drawing 01; revision C dated 13/11/2024; scale 1:500
- Reviewed
- 13 Jul 2026
The landscape plan specifies charcoal permeable block paving in 200 x 100 x 80 mm and 100 x 100 x 80 mm units, with silver permeable feature paving and in-situ brushed concrete footpaths.
Drawing-note evidence only. 'Or similar, as approved' allows substitution, and the drawing's named client differs from the application form applicant; no commercial relationship is inferred.
- Reference
- 2460714
- Locator
- PDF page 7; Printed page 7; SuDS Provisions; Figure 5 Typical local drain to dwelling
- Reviewed
- 13 Jul 2026
Each dwelling is proposed to have permeable front paving, with road and dwelling overflow routed to an infiltration basin and controlled public-network discharge.
Infiltration is conditional on suitable subgrade. The report does not state product selection or installed quantities.
- Reference
- 2460714
- Locator
- PDF page 10; Printed page 10; Foul Drainage
- Reviewed
- 13 Jul 2026
The foul system is specified as a uPVC gravity-drain network connecting dwellings to a new collector drain and the Uisce Eireann sewer.
Planning-stage evidence; implementation status is not stated.
- Reference
- 2460714
- Locator
- PDF page 12; Printed page 12; Proposed Watermain
- Reviewed
- 13 Jul 2026
The water system proposes a 100 mm HDPE primary main, 25 mm dwelling supply pipes, and Talbot Matrix-type boundary boxes.
The wording specifies a type for the boundary box but does not establish a selected supplier or purchase.
- Reference
- 2460714
- Locator
- Final-grant scope and separately listed commencement chronology
- Reviewed
- 13 Jul 2026
The official permission records 44 residential units. Linked notices cover 19 stated units.