92 dwellings, A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois - Planning Application 2560385
Laois / Portlaoise / A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois
Source-linked planning record
92 dwellings, A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois - Planning Application 2560385
Laois / Portlaoise / A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois- PB ref
- PB-10000304272
- Plan ref
- 2560385
- Authority
- Laois County Council
- Stage / date
- Granted / 13 Jan 2026
- Est. value band
- €10m–30m
- Units / floor
- 92 / 1,114,488 m²
- Project class
- Large residential
- Promoter
- not included in reference feed
- Architect / agent
- not included in reference feed
Source: http://www.eplanning.ie/LaoisCC/AppFileRefDetails/2560385/0
Key facts
Lead summary
- Source
- Laois County Council public planning register
- Planning authority
- Laois County Council
- Application reference
- 2560385
- Applicant
- not included in reference feed
- Agent
- not included in reference feed
- Decision stage
- Granted
- Decision
- 13 Jan 2026
- Units
- 92
- Floor area
- 1,114,488 m²
- Builder / developer
- Bircrest Limited
Document insights
Extracted from official planning documents
- Unit mix
- 46 3-bed, 46 4-bed
- Site area
- 3.85 ha
- Applicant / promoter
- Bircrest Limited
- Phasing
- Phase 2 of a multi-phase development (Phases 1A, 1B, 2, 3, 4) with 92 units; Phase 1A & 1B under construction, Phases 3 & 4 proposed concurrently.
- Scope
- Application for 92 residential units on 3.85 ha at Summerhill, Portlaoise, as Phase 2 of the Sand Wood development.
Facts only, extracted from official planning documents. Drawings and document packs are not republished.
Official description
Verbatim source text
construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.
Verify against official sourceProject team
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
- Builder / developer
- Bircrest Limited
Lifecycle timeline
Application to site progress
-
Completed
Completion not recorded Smaller works often do not require a completion certificate.