Save this project to account
Connected projectGranted

1 dwelling, No. 03A. Newbridge Street, Birr, Co. Offaly

Granted · No. 03A. Newbridge Street, Birr, Co. Offaly

Planning units1Source-stated
Planning floor area49.5 m²Source-stated; verify
Planning records1
Commencement events1
Appeals0
Completion evidence0

Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.

Planning lead

Current planning presentation

the development consisting of knocking an existing extension and rebuilding a new extension

Planning authority
offalycountycouncil
Lead planning reference
2560046
Application date
26 Feb 2025
Decision date
4 Sep 2025
Project type
Planning record
Value band
€250k–500k

Exact evidence

Planning records

2560046 · Planning application

Offaly County Council · CONDITIONAL · 2025-09-04

1 units · Source-stated planning-record quantity

49.5 m² · Source-stated planning-record quantity

Open official record

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Building control evidence

Separate commencement events

CN0138364OY · 2026-02-13

Extension on a two - storey semi detached terrace house. works will consist of the demolition of an existing extension. Extension will consist of kitchen, bedroom, ensuite,walk in wardrobe and a-roof. Address: 3A Newbridge Street, Birr, Offaly. . The proposed extension shall be designed and constructed in accordance with Part L of the Building Regulations – Conservation of Fuel and Energy. The works shall be assessed using DEAP methodology, where applicable, and shall ensure that the existing dwelling is not adversely affected in terms of energy performance. All new building elements including walls, roofs, floors, windows and doors shall achieve U-values equal to or better than the limiting values set out in Part L. Reasonable measures shall be taken to limit heat loss through air infiltration, thermal bridging and junction detailing. Heating, hot water and ventilation systems serving the extension shall be efficient, appropriately controlled and compatible with the existing dwelling. Energy-efficient fixed lighting shall be installed throughout the extension. The completed works shall comply fully with the requirements of Part L.

1 units · Source-stated event-specific quantity
49 m² · Source-stated event-specific quantity

Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.

Appeal evidence

Appeals

No appeal event is linked.

Completion evidence

Completion records

No completion evidence is linked.