Infrastructure, Nenagh General Hospital, Tyone Road, Nenagh Co. Tipperary
Granted · Nenagh General Hospital, Tyone Road, Nenagh Co. Tipperary
Qualified scale is available from the current public evidence. Planning and event-specific quantities remain separate below.
Planning lead
Current planning presentation
a new energy centre building, generator and fuel storage compounds to the existing services. Works to include the following; (a) the demolition of the existing diesel storage tank and associated concrete bund, removal of existing electrical generator, and associated fencing to the generator compound; (b) a proposed new secured fuel storage compound with associated stone faced walls and new self-bunded fuel storage tank; (c) a proposed new single storey energy centre building containing a new LV switch room, a new transformer room, a new RMU and a new ESB substation; (d) a proposed 2 no. freestanding electrical generators within a new generator compound with an associated timber fence; (e) alterations to the existing site to include for repositioned accessible parking, ramps, footpaths, and landscaping; (f) and all ancillary site works both above and below ground. This is a protected structure
- Planning authority
- tipperarycountycouncil
- Lead planning reference
- 2460313
- Application date
- 25 Apr 2024
- Decision date
- 11 Dec 2024
- Project type
- Infrastructure
- Public agent
- Carr Associates Architects
Exact evidence
Planning records
24/60313 · Planning application
Tipperary County Council · CONDITIONAL · 2024-12-11
Open official recordPlanning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Building control evidence
Separate commencement events
CN0136967TT · 2025-12-22
New ESB Sub- station, Switch Rooms, transformer, RMU and generator and fuel storage compounds with new security fencing and all ancillary works above and below ground.
91 m² · Source-stated event-specific quantity
Planning-case scale and each commencement-event quantity remain separate; notice quantities are never added into a project total.
Appeal evidence
Appeals
No appeal event is linked.
Completion evidence
Completion records
No completion evidence is linked.