Energy, Virginia Rd, Tanderagee, Bailieborough Co. Cavan - Planning Application 2660235

Cavan County Council · 2660235 · Cavan

Latest linked evidence

Grant date recorded · 2026-08-10

2660235

Current planning index: New Application. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

Final grant notified on 10 August 2026 following the council order of 1 July. February recommendations and March drawings identify design scope; no installation, commissioning or resolution of the extension interface is established.

4 official documents inspected · Checked 2026-09-05 · Official file index

Final grant covers one biomass enclosure and two LPG tanks

Council final grant verified · Cavan planning reference 2660235 at Bailieborough Community School

What the evidence says
The final-grant notification is dated 10 August 2026 and cites the council order of 1 July. It permits one biomass boiler enclosure and two new 2,000-litre LPG tanks, subject to seven conditions. These are plant and fuel-storage quantities, not housing units.

Cavan planning reference 2660235 at Bailieborough Community School

Why it may matter — interpretation
Interpretation: separates the planning decision date, final notification and equipment scope.

What is not established
A commencement date, completed installation and commissioning are not established.

Inspect the evidence

Bailieborough biomass installation: final grant · p.1
two new 2,000 litre LPG · Issued 2026-08-10 · Final notification dated 10 August; council order dated 1 July 2026 · Checked 2026-09-05

two new 2,000 litre LPG

The school-specific recommendation is 200 kW

Design proposal; installation not established · Bailieborough-specific recommendation in report P02 dated 26 February 2026

What the evidence says
The February Stage 1–2a report recommends a 200 kW biomass boiler supported by high-efficiency gas boilers. It also calls for replacement of the existing motor control centre, integration with the existing heating header and controls, and a new domestic hot-water cylinder.

Bailieborough-specific recommendation in report P02 dated 26 February 2026

Why it may matter — interpretation
Interpretation: identifies the actual retrofit package rather than applying the wider programme’s boiler range to this school.

What is not established
Selected boiler manufacturer, final capacity schedule, controls specification and procurement are not established.

Inspect the evidence

Bailieborough mechanical and electrical Stage 1–2a report · p.26
Implement the 200-kW biomass boiler · Issued 2026-02-26 · P02; school-specific report, separate from generic programme discussion; received 2026-05-08 · Checked 2026-09-05

Implement the 200-kW biomass boiler

The later drawing gives a larger enclosure envelope

Later application drawing; final installation unverified · March Stage 2B drawing following the February preliminary report

What the evidence says
The February report discusses a 13 m by 3.5 m enclosure. The Stage 2B drawing dated 26 March labels the proposed enclosure as 14,000 mm long, 4,100 mm wide and 4,268 mm high. It distinguishes enclosure supply by an ESCO manufacturer from the other mechanical and electrical services.

March Stage 2B drawing following the February preliminary report

Why it may matter — interpretation
Interpretation: preserves the dated dimensional revision and the stated package boundary.

What is not established
No specific ESCO supplier, contract award or as-built dimensions are established.

Inspect the evidence

Biomass enclosure layout drawing · p.1
Length / 14,000mm · Issued 2026-03-26 · Stage 2B submission; drawing (5-)M007; received 2026-05-08 · Checked 2026-09-05

Length / 14,000mm

Bailieborough mechanical and electrical Stage 1–2a report · p.26
13 m x 3.5 m · Issued 2026-02-26 · P02; school-specific report, separate from generic programme discussion; received 2026-05-08 · Checked 2026-09-05

13 m x 3.5 m

The LPG detail defines enclosure and civil requirements

Design proposal; installation not established · Stage 2B LPG detail of 26 March 2026; individual tank schematic

What the evidence says
The March schematic depicts a 3,000 mm long, 1,500 mm diameter LPG tank, at least 1 m surrounding clearance, roof netting, outward-opening gates and fencing at least 1.8 m high. It calls for a 150 mm concrete base. This single-tank schematic is not used to replace the grant’s two-tank quantity.

Stage 2B LPG detail of 26 March 2026; individual tank schematic

Why it may matter — interpretation
Interpretation: separates a repeatable tank detail from the authorised number of tanks.

What is not established
Final supplier coordination, approved installation layout and completed safety clearances are not established.

Inspect the evidence

LPG tank layout and compound drawing · p.1
1m CLEARANCE TO BE ACHIEVED · Issued 2026-03-26 · Stage 2B submission; drawing (5-)M006; received 2026-05-08 · Checked 2026-09-05

1m CLEARANCE TO BE ACHIEVED

The report flags a timing clash with extension works

Current sequencing not established · Dated February implementation caution, distinguished from the August planning grant

What the evidence says
The February report says the biomass project might not proceed as then planned because installation could interfere with the ongoing school extension. The August final grant establishes permission but does not establish that this sequencing concern was resolved.

Dated February implementation caution, distinguished from the August planning grant

Why it may matter — interpretation
Interpretation: keeps an operational dependency visible without claiming that the earlier delay remains active today.

What is not established
A coordinated installation programme, resolved interface and current works status have not been inspected.

Inspect the evidence

Bailieborough mechanical and electrical Stage 1–2a report · p.26
direct conflict with the ongoing extension works · Issued 2026-02-26 · P02; school-specific report, separate from generic programme discussion; received 2026-05-08 · Checked 2026-09-05

direct conflict with the ongoing extension works
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 4 government-published PDFs were visually inspected. Twenty public document rows were retained. Selected pages of four PDFs were visually reviewed; the full 49-page engineering report and other file entries were not completely inspected. Proposals do not establish procurement or installed work.

Source history

Timeline

  1. Planning application received

    2660235

  2. Planning decision

    2660235

    Conditional permission

  3. Grant date recorded

    2660235

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.