Connected planning records

Planning case 2360131

Kilkenny County Council · 2360131 · Kilkenny, Kilkenny

Latest linked evidence

Notified commencement · 2026-09-02

CN0146979KK · This commencement notice relates to enabling works only, comprising of the construction of the entrance access road off the N10 and all associated servicing, in accordance with the phasing drawing submitted with the approved planning applictaion. The overall development will comprise of a hotel, leisure and conference complex, incorporating the refurbishment and change of use of Hebron House (a Protected Structure) as the hotel reception with meeting rooms and offices, the development of hotel parkland and the construction of an access road off the N10 .The hotel extension off the refurbished two-storey over semi-basement Hebron House will provide a new two and three-storey hotel structure with 136 no. bedrooms, reception area, restaurant, bars, kitchen, staff room, stores, toilets, service areas, meeting rooms and conference centre and a lower ground floor level swimming pool, leisure centre, fitness suite, plant rooms and storage rooms. Within the grounds of the hotel, leisure and conference complex it is proposed to redevelop and landscape the existing walled garden and develop a landscaped parkland along the Pococke river, including footpaths and cycleways and a hotel car and bus park.A new access road is proposed from the N10 roundabout into Blanchfields land which will provide access to the proposed hotel complex and future developments on the Business Park zoned lands.Other works involve the demolition of existing outbuildings and sheds and the carrying out of all asso

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2360131

  2. Planning decision

    2360131

    Conditional permission

  3. Notified commencement

    CN0146979KK

    This commencement notice relates to enabling works only, comprising of the construction of the entrance access road off the N10 and all associated servicing, in accordance with the phasing drawing submitted with the approved planning applictaion. The overall development will comprise of a hotel, leisure and conference complex, incorporating the refurbishment and change of use of Hebron House (a Protected Structure) as the hotel reception with meeting rooms and offices, the development of hotel parkland and the construction of an access road off the N10 .The hotel extension off the refurbished two-storey over semi-basement Hebron House will provide a new two and three-storey hotel structure with 136 no. bedrooms, reception area, restaurant, bars, kitchen, staff room, stores, toilets, service areas, meeting rooms and conference centre and a lower ground floor level swimming pool, leisure centre, fitness suite, plant rooms and storage rooms. Within the grounds of the hotel, leisure and conference complex it is proposed to redevelop and landscape the existing walled garden and develop a landscaped parkland along the Pococke river, including footpaths and cycleways and a hotel car and bus park.A new access road is proposed from the N10 roundabout into Blanchfields land which will provide access to the proposed hotel complex and future developments on the Business Park zoned lands.Other works involve the demolition of existing outbuildings and sheds and the carrying out of all asso

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.