Planning case 2561468

Kildare County Council · 2561468

Latest linked evidence

Planning decision · 2026-07-16

2561468 · Conditional permission

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What the documents establish

Government document review

Pending appeal for Railpark West. These findings are limited to the submitted NIS dated 10 November 2025 and received 19 December 2025. Later engineering revisions, council conditions and final project scope have not been reviewed.

1 official documents inspected · Checked 2026-09-05 · Official file index

Green/blue roofs and three vegetated detention basins

Proposed in application · Railpark West operational drainage measures in the November 2025 submitted NIS

What the evidence says
The submitted NIS describes green/blue roofs on each apartment block and the creche, permeable paving in drives and parking areas, a central-green soakaway, rain butts, tree pits, bioretention areas, rain gardens, three vegetated detention basins, silt traps and hydrocarbon interceptors.

Why it may matter — interpretation
Interpretation: identifies roof, paving, landscape and drainage packages that must be coordinated across the residential development.

What is not established
The cited engineering report and drawings have not yet been inspected. Basin volumes, interceptor models, roof build-ups and any later revised or adopted conditions remain unconfirmed.

Inspect the evidence

Railpark West: Natura Impact Statement in support of Appropriate Assessment · p.22
Vegetated detention basins x 3 · Issued 2025-11-10 · Submitted NIS dated 10 November 2025; no later document revision inspected; received 2025-12-19 · Checked 2026-09-05

Vegetated detention basins x 3

Construction stores require impermeable bases and 110% bunding

Proposed in application · Construction-phase pollution controls in this submitted NIS

What the evidence says
The submitted NIS specifies chemical, fuel and oil stores on impermeable bases within a bund of 110% of storage capacity. It also specifies a 30 m separation from surface waterbodies for equipment, materials and chemicals, with spill kits, drip trays and designated refuelling areas.

Why it may matter — interpretation
Interpretation: identifies containment and site-establishment requirements.

What is not established
These are proposed mitigation measures, not evidence that a compound has been built or compliance verified. They do not describe a permanent fuel installation or an approved supplier.

Inspect the evidence

Railpark West: Natura Impact Statement in support of Appropriate Assessment · p.20
110% of the storage capacity · Issued 2025-11-10 · Submitted NIS dated 10 November 2025; no later document revision inspected; received 2025-12-19 · Checked 2026-09-05

110% of the storage capacity
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 1 government-published PDFs were visually inspected. One Commission-hosted PDF and three selected pages inspected. This is a partial technical evidence increment; the full council file and cited engineering drawings remain unreviewed. Proposals do not establish procurement or installed work.

Source history

Timeline

  1. Planning application received

    2561468

  2. Planning decision

    2561468

    Conditional permission

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.