Planning case 20180481

Wexford County Council · 20180481 · Ballymoney, Wexford

Latest linked evidence

Notified commencement · 2019-09-30

CN0057031WX · Permission for a single storey extension (41 sq.m, ridge height 5.4m to match existing) to the north-west side of existing annex (planning Ref:.no. 17848) to existing house, extension of existing pitched roof (ridge height 4.1m) over existing entrance hall/door to annex, removal of chimney on existing annex and installation of propriertary ecoflow tertiary treatment filter tank (height 1.65) on gravel distribution polishing bed with enclosing grassed embankment all around and associated pipework from existing enviropak lrd wastewater treatment system and installation of new surface water soakaways and associated drainage and site works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    20180481

    Official source

  2. Planning decision

    20180481

    Permission refused

    Official source

  3. Grant date recorded

    20180481

    Official source

  4. Notified commencement

    CN0057031WX

    Permission for a single storey extension (41 sq.m, ridge height 5.4m to match existing) to the north-west side of existing annex (planning Ref:.no. 17848) to existing house, extension of existing pitched roof (ridge height 4.1m) over existing entrance hall/door to annex, removal of chimney on existing annex and installation of propriertary ecoflow tertiary treatment filter tank (height 1.65) on gravel distribution polishing bed with enclosing grassed embankment all around and associated pipework from existing enviropak lrd wastewater treatment system and installation of new surface water soakaways and associated drainage and site works.

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.