Douglas, Cork · Cork City Council · Planning ref ABP-307041-20
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
Unique event Works stated Scale Commenced
SN0014823CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block R, No's 01 & 02 The Lawns, Belview Wood. This is Phase 2c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
18 Sep 2026
CN0147372CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block Q, No's 42 & 43, The View, Belview Wood. This is Phase 2b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
16 Sep 2026
CN0120061CY BCMS open-data feed
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
121 units · 11,298.6 m²Builder not named
30 Sep 2024
SN0010228CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block N, No's 07, 08, 09 & 10, The Heights, Belview Wood. This is Phase 1Q of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010200CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block L, No's 01 & 02, The Heights, Belview Wood. This is Phase 1o of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010187CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block O, No's 11 & 12, The Heights, Belview Wood. This is Phase 1R of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010185CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block P, No's 22 & 23, The View, Belview Wood. This is Phase 1S of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010182CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block M, No's 03, 04, 05 & 06, The Heights, Belview Wood. This is Phase 1P of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010179CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block I, No's 36 & 37, The Green, Belview Wood. This is Phase 1L of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010174CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block J, No's 32 & 33, The Green, Belview Wood. This is Phase 1M of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010173CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block K, No's 20 & 21, The View, Belview Wood. This is Phase 1n of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010172CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block G, No's 18, 19, 20 & 21, The Green, Belview Wood. This is Phase 1J of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010171CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block F, No's 14, 15, 16 & 17, The Green, Belview Wood. This is Phase 1I of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010170CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block H, No's 22 & 23, The Green, Belview Wood. This is Phase 1K of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
CN0113810CY BCMS open-data feed
The construction of 129 no. 2/3 storey dwelling houses and associated site works. This is Phase 1H of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
129 units · 12,994.2 m²Builder not named
24 Apr 2024
CN0113651CY BCMS open-data feed
The construction of 36 no 2-storey dwelling houses and associated site works. This is Phase 1g of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
36 units · 3,339.9 m²Builder not named
24 Apr 2024
SN0009928CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block D, No's 42 & 43, The Green, Belview Wood. This is Phase 1e of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009909CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block C, No's 46 & 47, The Green, Belview Wood. This is Phase 1d of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009903CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block E, No's 11 & 12, The Green, Belview Wood. This is Phase 1f of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009742CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 9 & 10, The Green, Belview Wood. This is Phase 1b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
SN0009741CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 1 & 2, The Green, Belview Wood. This is Phase 1a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
CN0110170CY BCMS open-data feed
The construction of 8 no 2-storey dwelling houses and associated site works. This is Phase 1c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
8 units · 696.6 m²Builder not named
22 Feb 2024
CN0108602CY BCMS open-data feed
The construction of 19 no 2/3 storey dwelling houses and associated site works. This is Phase 1 of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
19 units · 2,308.4 m²Builder not named
02 Jan 2024
CN0080886CY BCMS owner-supplied export
Construction of 6No. Residential Units (Numbers 10, 11, 12, 14, 15 & 16) and all associated Site Works at 'The Mews', Belview Wood, Maryborough, Douglas, Co. Cork.
3,136.8 m²Builder named
13 Sep 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
01 Sep 2026 · Latest notice
12 unique events
Cork, Cork · Cork City Council · Planning ref ABP-306325-20
Construction of neighbourhood 5 of Longview Estates (Árdan View) consisting of addresses 1-68, 93-178 Árdan View, and associated site works.
Unique event Works stated Scale Commenced
CN0146852CY BCMS open-data feed
Construction of Phase 1 in Neighbourhood 4 of Longview Estates consisting of addresses 1-39 Rathárd View, and associated site works.
39 units · 3,792.8 m²Builder not named
01 Sep 2026
SN0014059CY BCMS open-data feed
69-80 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 69-80 Árdan View, Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
23 Apr 2026
SN0014058CY BCMS open-data feed
81-92 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 81-92 Árdan View, Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
23 Apr 2026
CN0127801CY BCMS open-data feed
Construction of neighbourhood 5 of Longview Estates (Árdan View) consisting of addresses 1-68, 93-178 Árdan View, and associated site works.
154 units · 15,540.3 m²Builder not named
21 Apr 2025
CN0120878CY BCMS owner-supplied export
Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.
423.3 m²Builder named
15 Oct 2024
CN0117057CY BCMS owner-supplied export
Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.
Scale not statedBuilder named
15 Jul 2024
SN0010072CY BCMS open-data feed
1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 16no. residential units. Units as follows: 1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork
16 units · 1,500.6 m²Builder not named
19 Apr 2024
SN0010071CY BCMS open-data feed
67-75 Longview Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 9 no. residential units. Units as follows: 67-75 Longview Park - Longview Estates, Ballyvolane, Cork
9 units · 1,046.7 m²Builder not named
19 Apr 2024
SN0010070CY BCMS open-data feed
1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
19 Apr 2024
SN0010069CY BCMS open-data feed
1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 8no. residential units. Units as follows: 1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork
8 units · 755.3 m²Builder not named
19 Apr 2024
CN0113377CY BCMS open-data feed
Construction of dwellings 1-66 Longview Park, consisting of 4 no. two-storey detached houses, 8 no. three-storey detached houses, 44 no. two-storey semi-detached houses, 6 no. three-story semi-detached houses, 4 no. two-story terraced houses in one block of four, and associated site works.
66 units · 7,841.5 m²Builder not named
19 Apr 2024
CN0113330CY BCMS open-data feed
Construction of neighbourhood 2 of Longview Estates (Ráthard) consisting of addresses 13-53 Ráthard Park, 9-47 Ráthard Lawn, 17-55 Ráthard Drive, 1-6 & 12-28 Ráthard Avenue, and associated site works.
142 units · 15,715.3 m²Builder not named
19 Apr 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
20 Aug 2026 · Latest notice
4 unique events
Cobh, Cork · Cork County Council · Planning ref 24/04072
construction of 22 no. new dwelling houses and associated site works, nos 1-14 The Meadows, 1-8 the close,(all inclusive) Ard Roibín, carrignafoy, Cobh, Co Cork.
Reconciled event scale
21 units · 2,360.5 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
O'Mahony Developments (G) Ltd
Unique event Works stated Scale Commenced
CN0146354CC BCMS open-data feed
Construction of 21 nr. new dwelling units and associated site works, nrs. 14-34 incl., the Inlet, Ard Roibín, carrignafoy, Cobh, Co Cork
21 units · 1,911.8 m²Builder not named
20 Aug 2026
CN0138566CC BCMS owner-supplied export
Construction 14 no new dwelling houses and associated site works, nos. 21 to 34 incl. the close ard roibin carrignafoy cobh co cork
1,437.9 m²Builder named
20 Feb 2026
CN0134442CC BCMS owner-supplied export
The construction of 12 dwelling houses, nos. 9-20 incl., The Close Ard Roibín, Cobh, Co Cork.
1,176.4 m²Builder named
14 Oct 2025
CN0129281CC BCMS owner-supplied export
construction of 22 no. new dwelling houses and associated site works, nos 1-14 The Meadows, 1-8 the close,(all inclusive) Ard Roibín, carrignafoy, Cobh, Co Cork.
2,360.5 m²Builder named
04 Jun 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Aug 2026 · Latest notice
6 unique events
Cork, Cork · Cork City Council · Planning ref 24/43209
Construction of residential development of 64 dwelling houses and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Dwelling Houses No's 01 to 64 Waterfall Avenue, Ardrostig, Waterfall, Cork.
Unique event Works stated Scale Commenced
SN0014647CY BCMS open-data feed
Construction of a residential development comprising 27 apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 132–158 (Block 2) Waterfall Avenue, Ardrostig, Waterfall, Cork.
27 units · 2,611 m²Builder not named
18 Aug 2026
SN0014646CY BCMS open-data feed
Construction of a residential development comprising 27 apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 105–131 (Block 1) Waterfall Avenue, Ardrostig, Waterfall, Cork.
27 units · 2,611 m²Builder not named
18 Aug 2026
SN0014120CY BCMS open-data feed
Construction of a residential development comprising 12 duplex apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 93–104 (Duplex 03) Waterfall Avenue, Ardrostig, Waterfall, Cork.
12 units · 1,136.3 m²Builder not named
05 May 2026
SN0014119CY BCMS open-data feed
Construction of a residential development comprising 12 duplex apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 81–92 (Duplex 02) Waterfall Avenue, Ardrostig, Waterfall, Cork.
12 units · 1,136.3 m²Builder not named
05 May 2026
SN0014118CY BCMS open-data feed
Construction of a residential development comprising 16 duplex apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 65–80 (Duplex 01) Waterfall Avenue, Ardrostig, Waterfall, Cork.
16 units · 1,515.1 m²Builder not named
05 May 2026
CN0136650CY BCMS owner-supplied export
Construction of residential development of 64 dwelling houses and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Dwelling Houses No's 01 to 64 Waterfall Avenue, Ardrostig, Waterfall, Cork.
214,415.5 m²Builder named
15 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
17 Aug 2026 · Latest notice
12 unique events
Youghal, Cork · Cork County Council · Planning ref Part 8
Proposed Construction of a Residential Development of 28No. dwelling units & all associated Site Works, at Barrack Road, Youghal, Co. Cork
Reconciled event scale
11 units · 3,074 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0145610CC BCMS open-data feed
4 new housing units and associated site works at Dr. Patrick O'Sullivan Terrace, Aghada, Co. Cork
4 units · 423 m²Builder not named
17 Aug 2026
CN0145117CC BCMS open-data feed
7 housing units and associated site works at Park, Knocknagree, Co. Cork
7 units · 477 m²Builder not named
27 Jul 2026
CN0138375CC BCMS owner-supplied export
Proposed Construction of a Residential Development of 28No. dwelling units & all associated Site Works, at Barrack Road, Youghal, Co. Cork
2,382.9 m²Builder named
16 Feb 2026
CN0112523CC BCMS owner-supplied export
Construction of 4 townhouses and 12 apartments and associated works at Sleaveen Road, Macroom.
1,043 m²Builder named
08 Apr 2024
CN0108678CC BCMS open-data feed
The development consists of the construction of 11no. residential housing units, namely Nos 1 - 11 at Uplands Fermoy. The residential units consist of one and two storey houses, both terrace and semi detached in nature as well as hard and soft landscaping works, connection to public utilities and all associated site works.
11 units · 776.8 m²Builder not named
15 Jan 2024
CN0102604CC BCMS owner-supplied export
2 new semi detached dwellings and associated works at 9 & 10 Carrig Rossa, Rossmore, Co. Cork
178 m²Builder named
17 Jul 2023
CN0093741CC BCMS owner-supplied export
Construction of 1 detached dwelling at 2A Glenview Terrace Lyre Cork
95 m²Builder named
24 Sep 2022
CN0090322CC BCMS open-data feed
Block B-Erection of 7 terraced single storey, masonry construction, one bedroom dwellings. Block C-Change of use of School Building to social housing. Construction of 2no. 1 bed dwellings to school building, and 1 single storey extension, masonry construction, one bedroom dwelling.
10 units · 3,074 m²Builder not named
14 Jun 2022
CN0090260CC BCMS owner-supplied export
Change of use of convent to social housing. Construction of 8no. 2 bed apartments over two floors of Convent. Construction of single storey and two storey extensions of masonry construction.
922 m²Builder named
08 Jun 2022
CN0086380CC BCMS owner-supplied export
The development of 2no. two bed, two storey residential units including hard and soft landscaping, connection to public utilities and all associated site works at Doctor Croke Place, Garranmacgarrett, Kilbrin.
162 m²Builder named
28 Feb 2022
CN0076842CC BCMS owner-supplied export
Single Storey extension to Skibbereen Townhall and toilet renovations
61.9 m²Builder named
04 Jun 2021
CN0069681CC BCMS open-data feed
Construction of 4 No. Dwellings including all site development works.
4 units · 348 m²Builder not named
28 Oct 2020
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
11 Aug 2026 · Latest notice
7 unique events
Cork, Cork · Cork City Council · Planning ref ABP-312866-22
Proposed Construction of Block B a 7 storey (Ground + 6) residential development comprising 90 residential units over ground floor ancillary accommodation including a refuse store, bicycle storage, switch room and ESB room at the Creamfields site, junction of Kinsale Road and Tramore Road, Cork.
Reconciled event scale
142 units · 18,646 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0014590CY BCMS open-data feed
Proposed Construction of Block H a Four Storey (Ground, First, Second with rooftop terrace) Residential Duplex Building incorporating Four Ground Floor own door accessed Apartments with Four own odor accessed Duplex units over, including site ancillary works at Kinsale Road and Tramore Road, Cork.
8 units · 1,005.1 m²Builder not named
11 Aug 2026
SN0014455CY BCMS open-data feed
Proposed Construction of Block B a 7 storey (Ground + 6) residential development comprising 90 residential units over ground floor ancillary accommodation including a refuse store, bicycle storage, switch room and ESB room at the Creamfields site, junction of Kinsale Road and Tramore Road, Cork.
90 units · 7,918.3 m²Builder not named
14 Jul 2026
SN0014346CY BCMS open-data feed
Block J is a proposed 6-storey, comprising ground plus 5, residential development located on the Creamfields site located at the junction of Kinsale Road and Tramore Road in Cork City. The building contains a total of 69 residential units arranged in a dual stair core arrangement. The block contains a total of 14 duplex units located at ground and first floor level in addition to the 55 as single floor open plan flats. At ground floor level the building contains ancillary accommodation such as refuse storage, bicycle storage, Switchroom and ESB rooms typical of a Block of Flats.
69 units · 6,960 m²Builder not named
23 Jun 2026
SN0014202CY BCMS open-data feed
Proposed Construction of Block G a Four Storey (Ground, First, Second with rooftop terrace) Residential Duplex Building incorporating Five Ground Floor own door accessed Apartments with Five own door accessed Duplex units over, including site ancillary works at Kinsale Road and Tramore Road, Cork.
10 units · 1,266.5 m²Builder not named
25 May 2026
SN0013498CY BCMS open-data feed
Proposed construction of 9 storey residential building including site ancilalry works at Kinsale Road and Tramore Road, Cork.
116 units · 10,278 m²Builder not named
18 Dec 2025
SN0013491CY BCMS open-data feed
Proposed construction of 9 storey building and site ancillary works at Kinsale Road and Tramore Road, Cork.
142 units · 13,493 m²Builder not named
18 Dec 2025
SN0013487CY BCMS open-data feed
Proposed Construction of 15 Storey building including podium deck, underground car park and site ancillary works at Kinsale Road and Tramore Road, Cork
112 units · 18,646 m²Builder not named
18 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
14 Jul 2026 · Latest notice
4 unique events
Cork, Cork · Cork City Council · Planning ref 23/42446
Construction of 26 Dwelling houses and associated site works, House Nos 43 to 62 The Laurels (inclusive) and 77 to 82 The Laurels (Inclusive), Cois Caislean, Maglin Road, Ballincollig., Cork.
Reconciled event scale
24 units · 3,346.8 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Stonecrest Construction Ltd
Unique event Works stated Scale Commenced
CN0144905CY BCMS open-data feed
Construction of 6 no dwellings and associated site works, 83 - 88 inclusive, The laurels, Cois Caislean, Maglin Road, Ballincollig, Cork.
6 units · 744 m²Builder not named
14 Jul 2026
CN0141713CY BCMS owner-supplied export
Construction of 26 Dwelling houses and associated site works, House Nos 43 to 62 The Laurels (inclusive) and 77 to 82 The Laurels (Inclusive), Cois Caislean, Maglin Road, Ballincollig., Cork.
3,346.8 m²Builder named
05 May 2026
SN0012637CY BCMS open-data feed
Construction of 6 Duplex Units and associated site works, Nos. 13-18 inclusive The Laurels, Cois Caislean, Maglin Road, Ballincollig, Cork.
6 units · 438 m²Builder not named
18 Jun 2025
CN0123776CY BCMS owner-supplied export
Construction of 24 no. new dwelling houses and associated site works, nos. 19-42 inclusive the laurels, cois caislean, maglin rd., ballincollig, cork.
24 units · 3,190.5 m²Builder named
23 Dec 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
27 Aug 2026 · Latest notice
4 unique events
Ardmore, Passage West, Cork · Cork County Council · Planning ref 224692
Construction of nos 1,2,3,4,5,6,7,8,9,10, 11,12,13,14,15,16,1 7,18,19,20,21,22,23 ,24,25,26,27,28,29, 30,31,32,33,34,35,3 6,37 & 38 The Tides, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
Reconciled event scale
44 units · 8,550 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0146560CC BCMS open-data feed
Construction of nos 3 to 19 The Pierside, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
17 units · 2,071.1 m²Builder not named
27 Aug 2026
CN0132767CC BCMS owner-supplied export
Construction of nos 1,2,3,4,5,6,7,8,9,10, 11,12,13,14,15,16,1 7,18,19,20,21,22,23 ,24,25,26,27,28,29, 30,31,32,33,34,35,3 6,37 & 38 The Tides, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
8,550 m²Builder not named
04 Sep 2025
CN0111236CC BCMS open-data feed
Construction of Nos 35,36,37,38,39,40,41,42,43,44 Haven Way, 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26 & 30,31,32,33,34,35,36,37 The Gardens, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
44 units · 5,808 m²Builder not named
21 Mar 2024
CN0099920CC BCMS open-data feed
Construction of Nos 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33 & 34 Haven Way, Harbour Heights, Rochestown Road, Ardmore, Passage West, Co. Cork.
34 units · 3,457.8 m²Builder not named
27 Apr 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Aug 2026 · Latest notice
4 unique events
Cork, Cork · Cork City Council · Planning ref ABP-309059-20
Proposed construction of Podium 2 which consists of Block's 5, 6, 7 & 8 over a ground floor car park at The Former Ford Distribution Site, Centre Park Road, Cork
Reconciled event scale
344 units · 40,950 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0014645CY BCMS open-data feed
Proposed construction of Podium 2 which consists of Block's 5, 6, 7 & 8 over a ground floor car park at The Former Ford Distribution Site, Centre Park Road, Cork
321 units · 38,867 m²Builder not named
18 Aug 2026
SN0010094CY BCMS open-data feed
Proposed construction of Podium 3 which consists of Block's 9, 10, 11 & 12 over a ground floor car park at The Former Ford Distribution Site, Centre Park Road, Cork
344 units · 40,950 m²Builder not named
19 Apr 2024
SN0010091CY BCMS open-data feed
Proposed construction of Podium 2 which consists of Block's 5, 6, 7 & 8 over a ground floor car park at The Former Ford Distribution Site, Centre Park Road, Cork
321 units · 38,867 m²Builder not named
19 Apr 2024
SN0010090CY BCMS open-data feed
Proposed Construction of Podium 1 a mixed use commercial/residential development which consists of Blocks 1, 2, 3, 4 & a shell and core creche block over a ground floor car park at The Former Ford Distribution Site, Centre Park Road, Cork
337 units · 40,262 m²Builder not named
19 Apr 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
15 Jul 2026 · Latest notice
2 unique events
Cork, Cork · Cork City Council · Planning ref 21/40196 and 24/43351
Construction of a seven-storey residential development comprising of 67 apartments, ancillary service areas, and associated site works.
Reconciled event scale
123 units · 13,796.7 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0014470CY BCMS open-data feed
Construction of a seven-storey residential development comprising of 67 apartments, ancillary service areas, and associated site works.
67 units · 6,788.2 m²Builder not named
15 Jul 2026
SN0014392CY BCMS open-data feed
Construction of a seven-storey residential development comprising of 123 apartments, ancillary service areas, a ground floor car park, and associate site works.
123 units · 13,796.7 m²Builder not named
29 Jun 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
23 Sep 2026 · Commenced
1 unique event
Kinsale, Cork · Cork County Council · Planning ref 22/5657
The demolition and removal of existing facilities including changing rooms, ball alley and other ancillary facilities; and the construction of 70 no. dwelling houses and all associated ancillary development works including vehicular and pedestrian access, parking, footpaths, lighting, drainage, landscaping and amenity areas. The proposed development allows for the provision of a pedestrian/cycle link to connect into Abbeyfort Estate to the northeast.
Reconciled event scale
70 units · 5,938.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
03 Sep 2026 · Commenced
1 unique event
Cork, Cork · Cork City Council · Planning ref P8.HCP.25.10
Construction of 107 no. houses at Cruiscín Airde, Lehenaghmore, together with all associated site development, infrastructure, landscaping and ancillary works.
Reconciled event scale
107 units · 10,233.9 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
New build
24 Aug 2026 · Commenced
1 unique event
Cork, Cork · Cork City Council · Planning ref 25/44084
Construction of 88 nr. new dwelling houses and associated site works, 275-282, 287-305, 329-389 (all inclusive) Arderrow ballyvolane, cork, co. cork.
Reconciled event scale
88 units · 8,102.2 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
17 Aug 2026 · Commenced
1 unique event
Mallow, Cork · Cork County Council · Planning ref 24/06036
Proposed Construction of Phase 1 Residential Units comprising of 93 units and associated site works (1-13 Earl's Square), (1-8 Earl's Lawn ), (1-8 Park Vale), (1-14 Earl's Walk), (1-42 Parklands), (1-8 Bowers Lane) at Castlepark, Castlelands, Mallow.
Reconciled event scale
93 units · 17,532 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
06 Aug 2026 · Commenced
1 unique event
Ardrostig, Bishopstown, Cork · Cork City Council · Planning ref 25/44140 [ACP-324056-26]
Construction of 143no. dwelling houses at Waterfall Road, Ardarostig, Bishopstown, Cork.
Reconciled event scale
143 units · 14,737.3 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
12 Aug 2026 · Latest notice
3 unique events
Clonakilty, Cork · Cork County Council · Planning ref 2500324
Construction of 24 no. dwelling houses (house no.'s 41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59,60,61,62,63,64) at Clogheen, Clonakilty, Co. Cork
Reconciled event scale
25 units · 2,702 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0145929CC BCMS open-data feed
Construction of 24 no. dwelling houses (house no.'s 41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59,60,61,62,63,64) at Clogheen, Clonakilty, Co. Cork
24 units · 1,594 m²Builder not named
12 Aug 2026
CN0145334CC BCMS open-data feed
Construction of 25 new dwelling houses (house no.'s 16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40) at Clogheen, Clonakilty, Co. Cork
25 units · 2,702 m²Builder not named
30 Jul 2026
CN0144648CC BCMS open-data feed
Construction of 15 no. dwelling houses (house no.'s 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15) at Clogheen, Clonakilty, Co. Cork
15 units · 1,351 m²Builder not named
13 Jul 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
24 Aug 2026 · Commenced
1 unique event
Cork, Cork · Cork City Council · Planning ref 24/43524
1-20 Cedar Brook, Wilton, Cork - Construction of 10 no. apartments and 10no. duplex apartments (Nos.1-20)and all ancillary site works.
Reconciled event scale
20 units · 1,792 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
22 Jul 2026 · Commenced
1 unique event
Droichead na Bandan, Cork · Cork County Council · Planning ref 25/6376
construction of residential estate of 212 units, Phase 1 consisting of 42 dwelling houses on sites 23 to 26 The Willows, and 1 to 22 The Hawthorns, and 1 to 16 The Birches, Blossomhill.
Reconciled event scale
42 units · 4,560.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Extension Material alteration Change of use
17 Sep 2026 · Latest notice
2 unique events
Cork, Cork · Cork City Council · Planning ref 20/39715
Material Alterations and change of use of Existing 5 storey building from Office & Storage to 7 no. Apartments on Second, Third & fourth floors including new Fifth floor Extension and new Residential Access & Refuse bin store at Ground Floor level.
Reconciled event scale
776 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
DMH Homes Ltd T/a DMH Construction
Unique event Works stated Scale Commenced
SN0014843CY BCMS open-data feed
Material alterations to include the internal fitout of a restaurant
222.7 m²Builder not named
17 Sep 2026
CN0086391CY BCMS owner-supplied export
Material Alterations and change of use of Existing 5 storey building from Office & Storage to 7 no. Apartments on Second, Third & fourth floors including new Fifth floor Extension and new Residential Access & Refuse bin store at Ground Floor level.
776 m²Builder named
24 Feb 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
08 Oct 2026 · Latest notice
2 unique events
Clonakilty, Cork · Cork County Council · Planning ref 25/5853
Construction of 6 no. House type J-J House numbers 10, 11, 29, 30, 51 and 52, 6 no. house types J-K House numbers 22, 23, 31, 32, 49 and 50.
Reconciled event scale
12 units · 1,945.9 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0148308CC BCMS open-data feed
Construction of 4 no. House type C House numbers 3, 4, 5 and 9.
4 units · 593.0 m²Builder not named
08 Oct 2026
CN0144102CC BCMS open-data feed
Construction of 6 no. House type J-J House numbers 10, 11, 29, 30, 51 and 52, 6 no. house types J-K House numbers 22, 23, 31, 32, 49 and 50.
12 units · 1,945.9 m²Builder not named
01 Jul 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
17 Aug 2026 · Commenced
1 unique event
Glasheen Road, Cork · Cork City Council · Planning ref 2443368
Construction of development, formally known as No. 7, St. Helen's Court, Glasheen Road, Cork, of 4 no. semi-detached houses, 4 no. detached houses and ancillary site works.
Reconciled event scale
8 units · 1,168 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
16 Aug 2026 · Commenced
1 unique event
Midleton, Cork · Cork County Council · Planning ref 22/06627, 26/1322
Construction of 15 no. new dwelling houses and associated site works, 1-11 incl. olan way sth, 1-3 incl. griffin drive west, 9 the square, ardgriffin, water rock road, midleton, co. cork.
Reconciled event scale
15 units · 1,698.3 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
15 Jul 2026 · Commenced
1 unique event
Cork, Cork · Cork City Council · Planning ref 26/44475
Residential Development at No 49-58, Orchard View, Heathfield, Ballincollig, Cork of of 10 no residential units and all ancillary site development works.The proposed development consists of the construction of 4 no 3 bedroom semi-detached dwelling houses, 4 no 3 bedroom townhouses and 2 no 2 bedroom townhouses. Access to the proposed development will be provided via the existing junction from the Killumney Road serving the Heathfield residential development and the internal road network of the development permitted by Cork City Council Planning Reference 22/41644 to the east, which is currently under construction. The proposed development also provides for alterations to the permitted layout of Cork City Council Planning Reference 22/41644 comprising the reconfiguration of parking areas to facilitate access to the subject site. Ancillary site works include the provision of bin and bicycle stores, the decommissioning and removal of 2 no existing septic tanks and percolation areas serving 2 no existing dwelling houses to the north and the connection of these dwellings to the sewer network serving the proposed residential development.
Reconciled event scale
10 units · 1,070 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
02 Jul 2026 · Commenced
1 unique event
Kinsale, Cork · Cork County Council · Planning ref 24/04201
Construction of a residential development of 5 no. detatched dwelling houses and all ancillary site development works.
Reconciled event scale
5 units · 1,113.9 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
New build
29 Sep 2026 · Commenced
1 unique event
Corcaigh, Cork · Cork City Council · Planning ref 25/43686
Construction of 3 no. Dwellings No's 167-169 ( 11,12 & 13 Primrose Close) which has been permitted under Cork City Council Planning Reference No. 25/43686 and all ancillary site development works.
Reconciled event scale
3 units · 1,038 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named