Commencement notice group

Housing commencement notices — Ballyvolane

Cork, Cork

12 unique commencement events · latest notified commencement 01 Sep 2026 · planning reference supplied

Planning story

Cork, Cork — ABP-306325-20

Exact official references
ABP-306325-20
Final official decision
Granted with conditions
Unique commencement events
12
Latest notified commencement
01 Sep 2026

No overall constructed, completed-unit or percentage-progress figure is inferred from these notices.

Unique commencement events
12
Latest notified commencement
01 Sep 2026
Latest notice
39 units
Planning references supplied
ABP-306325-20
Public location
Cork, Cork

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
1
Duplicate source rows consolidated
0
Exact completion events
1

Planning ABP-306325-20 — Granted with conditions · Decision 2020-05-27

Strategic Housing Application · ABP-306325-20

ABP-306325-20 has an exact reviewed strategic housing application relationship; the parent reference is not published in this projection.

Cork City Council · checked 2026-09-06T20:32:29.425083+00:00

Open exact official relationship evidence

Exact appeal 306325 · Grant Perm. w Conditions · 2020-05-27 · Open official case

  1. Completion certificate validated Cork City Council · commencement CN0127801CY Open official certificate CC00000063721CY Certificate CC00000063721CY · Certificate validation date 2026-08-27 See official certificate for completed works · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Major-project dossier · Wave 4 · W4-E085 · Batch 4

Reviewed planning, commencement and document evidence

View the dossier catalogue
Source-limited dossier Useful reviewed evidence is published without filling gaps from unverified sources.

Source-backed scopeHousing commencement notices — Ballyvolane

Planning scope and commencement-event scale are retained as separate evidence; this label is not expanded into unreviewed works.

Commencement identities
11
retained separately
Latest group date
23 Apr 2026
not assigned across events
Maximum on one notice
222 units
never summed
Reviewed index
0
0 exact document links

Planning and appeal references

  • Appeal ABP-306325-20 Exact dated record link unavailable in this reviewed source

Supplier screening cues

  • Residential scale screening cueMaximum stated scale on one retained notice: 222 units.
  • Built-area screening cueMaximum stated floor area on one retained notice: 15715.3 m².
  • Multi-event delivery screening cue11 distinct commencement identities are retained; they are not combined into a single scale.

Every retained commencement event

  • Date not stated SN0014059CY Official public source URL unavailable in the reviewed projection
  • Date not stated SN0014058CY Official public source URL unavailable in the reviewed projection
  • Date not stated CN0127801CY Official public source URL unavailable in the reviewed projection
  • Date not stated CN0120878CY Official public source URL unavailable in the reviewed projection
  • Date not stated CN0117057CY Official public source URL unavailable in the reviewed projection
  • Date not stated SN0010072CY Official public source URL unavailable in the reviewed projection
  • Date not stated SN0010071CY Official public source URL unavailable in the reviewed projection
  • Date not stated SN0010070CY Official public source URL unavailable in the reviewed projection
  • Date not stated SN0010069CY Official public source URL unavailable in the reviewed projection
  • Date not stated CN0113377CY Official public source URL unavailable in the reviewed projection
  • Date not stated CN0113330CY Official public source URL unavailable in the reviewed projection

Exact organisation roles

  • Cork City CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
  • An Coimisiún PleanálaAppealauthority · One or more appeal references are retained.
Source limitations and event boundary

Reviewed snapshot differs from current group. The dossier remains tied to its checked snapshot. Current and reviewed event identities are kept separate rather than merged.

  • The public evidence source provides a project label, references, group-level maxima and a reviewed document extract; it does not provide a full permission description for this dossier.
  • Planning and appeal event dates are unavailable in the reviewed public source and are not inferred.
  • Organisation coverage is limited to the responsible planning authority and, where an appeal reference exists, An Coimisiún Pleanála; no supplier appointment is claimed.
  • Reviewed public index extract; this is not asserted to be the complete authority file.
  • The reviewed source supplies only the latest group commencement date and group maxima, so values are not assigned to individual events and are never summed.
  • No publishable exact official planning-record URL was available in the reviewed source.
  • No exact official planning or appeal case identity is present in the reviewed evidence.

Planning-anchored public geography

Site identity and location

Canonical public locality
Cork, Cork
County
Cork

Notice location variants

  • Ballyvolane, Cork CN0117057CY, SN0010072CY, SN0010071CY, SN0010070CY, SN0010069CY, CN0113377CY, CN0113330CY
Location evidence needs care
  • Notice source points are up to 704 m apart, so no combined representative point is shown.

Source positions remain separate:

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official SHD case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-306325-20. Cork City Council Verified official link Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0146852CY BCMS open-data feed

Construction of Phase 1 in Neighbourhood 4 of Longview Estates consisting of addresses 1-39 Rathárd View, and associated site works.

Work stated for this notice 39 units Explicit phase quantity stated by the source.

Floor area stated for this source: 3,793 m².

Appeal reference ABP-306325-20
SN0014059CY BCMS open-data feed

69-80 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 69-80 Árdan View, Longview Estates, Ballyvolane, Cork

Work stated for this notice 12 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,126 m².

Appeal reference ABP-306325-20
SN0014058CY BCMS open-data feed

81-92 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 81-92 Árdan View, Longview Estates, Ballyvolane, Cork

Work stated for this notice 12 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,126 m².

Appeal reference ABP-306325-20
CN0127801CY BCMS open-data feed

Construction of neighbourhood 5 of Longview Estates (Árdan View) consisting of addresses 1-68, 93-178 Árdan View, and associated site works.

Work stated for this notice 154 units Explicit phase quantity stated by the source.

Floor area stated for this source: 15,540 m².

Appeal reference ABP-306325-20
CN0120878CY BCMS owner-supplied export

Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 423 m².

Source unit value with scope not stated: 222 units. It is not presented as notice-specific scale.

Appeal reference ABP-306325-20 Builder stated: CField CS Ltd
CN0117057CY BCMS owner-supplied export

Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.

Work stated for this notice Scale not stated for this notice.
Appeal reference ABP-306325-20 Builder stated: CField CS Ltd
SN0010072CY BCMS open-data feed

1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 16no. residential units. Units as follows: 1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork

Work stated for this notice 16 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,501 m².

Appeal reference ABP-306325-20
SN0010071CY BCMS open-data feed

67-75 Longview Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 9 no. residential units. Units as follows: 67-75 Longview Park - Longview Estates, Ballyvolane, Cork

Work stated for this notice 9 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,047 m².

Appeal reference ABP-306325-20
SN0010070CY BCMS open-data feed

1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork

Work stated for this notice 12 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,126 m².

Appeal reference ABP-306325-20
SN0010069CY BCMS open-data feed

1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 8no. residential units. Units as follows: 1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork

Work stated for this notice 8 units Explicit phase quantity stated by the source.

Floor area stated for this source: 755 m².

Appeal reference ABP-306325-20
CN0113377CY BCMS open-data feed

Construction of dwellings 1-66 Longview Park, consisting of 4 no. two-storey detached houses, 8 no. three-storey detached houses, 44 no. two-storey semi-detached houses, 6 no. three-story semi-detached houses, 4 no. two-story terraced houses in one block of four, and associated site works.

Work stated for this notice 66 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 7,842 m².

Appeal reference ABP-306325-20
CN0113330CY BCMS open-data feed

Construction of neighbourhood 2 of Longview Estates (Ráthard) consisting of addresses 13-53 Ráthard Park, 9-47 Ráthard Lawn, 17-55 Ráthard Drive, 1-6 & 12-28 Ráthard Avenue, and associated site works.

Work stated for this notice 142 units Explicit phase quantity stated by the source.

Floor area stated for this source: 15,715 m².

Appeal reference ABP-306325-20

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.