Material alteration
09 Nov 2022 · Commenced
1 unique event
Monaghan, Monaghan · Monaghan County Council · Planning ref 22295
Changes to the internal Layout of the factory building with the addition of washroom and canteen facilities, changes to escape stairs to existing Mezzanine level, changes to the elevations including the additions of doors and windows to the north east facing elevation (roadside)
Reconciled event scale
5,220 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
John E Coyle Furniture Ltd
Extension
04 Nov 2022 · Commenced
1 unique event
Dublin, Dublin · South Dublin County Council · Planning ref SD22B/0131
Single and two storey extension to the rear with pitched gable end roof and two dormers; new single storey extension with hip roof to the front; demolition of the existing shed to the rear; new vehicle access to the front with dished footpath; attic conversion for storage
New build
26 Oct 2022 · Latest notice
2 unique events
Mogeely, Cork · Cork County Council · Planning ref 22/04910
Construction of 13no. two storey dwellings at Cois Maigh, Mogeely, Co. Cork. [House Nos 23-35 The Elms]
Reconciled event scale
13 units · 1,472.8 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0094865CC BCMS open-data feed
Construction of 13no. two storey dwellings at Cois Maigh, Mogeely, Co. Cork. [House Nos 23-35 The Elms]
13 units · 1,472.8 m²Builder not named
26 Oct 2022
CN0094356CC BCMS open-data feed
Construction of 11no. two storey dwellings at Cois Maigh, Mogeely, Co. Cork. [House Nos 26-32 The Oaks and 36-39 The Elms]
11 units · 1,097.2 m²Builder not named
11 Oct 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
26 Oct 2022 · Latest notice
3 unique events
Slane, Meath · Meath County Council · Planning ref LB/190883
Phase 3 Construction of 13 no. Houses ( Houses 8-19A)
Reconciled event scale
13 units · 1,623.5 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Garrettstone Developments Ltd / Lorrac Developments
Unique event Works stated Scale Commenced
CN0094849MH BCMS open-data feed
Phase 3 Construction of 13 no. Houses ( Houses 8-19A)
13 units · 1,623.5 m²Builder not named
26 Oct 2022
CN0083827MH BCMS owner-supplied export
Fennor Lodge Phase 2 - construction of 7 No. Houses (House no.20-26)
7 units · 891.4 m²Builder named
29 Nov 2021
CN0080546MH BCMS open-data feed
Fennor Lodge Phase 1 - construction of 10 no. houses (House no. 27-36)
10 units · 1,267.0 m²Builder not named
30 Aug 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
23 Sep 2022 · Latest notice
2 unique events
Ballon, Carlow · Carlow County Council · Planning ref 16384
Phase 2,3,4 of Proposed Housing development at Laragh Beg, Ballon comprising of 9no. terraced and 8no. semi detached two storey dwellings. (Phase 1 almost complete and extension of duration lodged 22/224 for 16/384)
Reconciled event scale
22 units · 1,805 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0093831CW BCMS open-data feed
Phase 2,3,4 of Proposed Housing development at Laragh Beg, Ballon comprising of 9no. terraced and 8no. semi detached two storey dwellings. (Phase 1 almost complete and extension of duration lodged 22/224 for 16/384)
17 units · 1,805 m²Builder not named
23 Sep 2022
CN0067601CW BCMS owner-supplied export
Phase 1 (5no. Houses) of a housing development of 22no. houses at Laragh Beg, Ballon, Co. Carlow
22 units · 610 m²Builder not named
21 Aug 2020
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
06 Sep 2022 · Latest notice
3 unique events
Kilkenny, Kilkenny · Kilkenny County Council · Planning ref 16/593
Construction of 5 no. detached dwelling houses on sites 1, 2, 4, 5 & 6, access road, underground services and assocaited site works at Archersleas, Callan Road, Kilkenny
Unique event Works stated Scale Commenced
CN0093120KK BCMS open-data feed
Construction of 5 no. detached dwelling houses on sites 1, 2, 4, 5 & 6, access road, underground services and assocaited site works at Archersleas, Callan Road, Kilkenny
5 units · 1,050.2 m²Builder not named
06 Sep 2022
CN0060222KK BCMS owner-supplied export
Construction of 4 no. detached dwelling houses (site no.'s 3-6 Archersleas)
4 units · 730.8 m²Builder named
19 Dec 2019
CN0047300KK BCMS owner-supplied export
Construction of 4 no. detached dwelling houses (No.'s 3-6 Archersleas)
4 units · 730.8 m²Builder named
16 Jan 2019
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
31 Aug 2022 · Latest notice
2 unique events
Crusheen, Clare · Clare County Council · Planning ref 211272, 2153
Construction of 16 no dwellings and associated site works, 14 to 29 inclusive, Radharc an Dun, Crusheen, Ennis, Co. Clare.
Reconciled event scale
16 units · 1,682 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0092942CE BCMS open-data feed
Construction of 16 no dwellings and associated site works, 14 to 29 inclusive, Radharc an Dun, Crusheen, Ennis, Co. Clare.
16 units · 1,682 m²Builder not named
31 Aug 2022
CN0088293CE BCMS open-data feed
Construction of 13 no. new dwelling houses and associated site works, nos. 1 to 13 inclusive Radharc an Dun, Crusheen, Ennis, Co. Clare.
13 units · 1,512 m²Builder not named
19 Apr 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Jul 2022 · Latest notice
4 unique events
Ennis, Clare · Clare County Council · Planning ref P20/190
Construction of residential units 1-5, 8-14 and 19-25 inclusive of proposed development at Cluain Ros Leamhan including roads, services and ancillary site works.
Reconciled event scale
19 units · 2,037.9 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0007450CE BCMS open-data feed
Construction of Type J Unit no. 17/18 Cluain Ros Leamhan, Tulla Road, Ennis, Co. Clare.
2 units · 154.7 m²Builder not named
28 Jul 2022
SN0007451CE BCMS open-data feed
Construction of Type H Unit 15/16 Cluain Ros Leamhan, Tulla Road, Ennis, Co. Clare.
2 units · 154.7 m²Builder not named
21 Jul 2022
SN0007449CE BCMS open-data feed
Construction of unit 6/7 Type H Cluain Ros Leamhan, Tulla Road, Ennis, Co. Clare.
2 units · 154.7 m²Builder not named
20 Jul 2022
CN0088638CE BCMS open-data feed
Construction of residential units 1-5, 8-14 and 19-25 inclusive of proposed development at Cluain Ros Leamhan including roads, services and ancillary site works.
19 units · 2,037.9 m²Builder not named
27 Apr 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
01 Jul 2022 · Latest notice
11 unique events
Ballygarron, Waterford · Waterford City and County Council · Planning ref 20/963
Unit 14 - Construction of a 1984sq.m industrial unit for the purposes of bonded storage of spirits
Reconciled event scale
1,984 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Colm Byrne Civil & Builiding Contractor Ltd
Unique event Works stated Scale Commenced
CN0090946WD BCMS owner-supplied export
Unit 18 - Construction of a 1732sq.m double portal frame building for the purposes of the bonded storage of spirits.
1,732 m²Builder named
01 Jul 2022
CN0090941WD BCMS open-data feed
Unit 17 - Construction of a 1984sq.m double portal frame building for the purposes of the bonded storage of spirits.
1,984 m²Builder not named
01 Jul 2022
CN0090718WD BCMS owner-supplied export
Unit 16 - Construction of a 1984sq.m double portal frame building for the purposes of the bonded storage of spirits.
1,984 m²Builder named
22 Jun 2022
CN0090692WD BCMS owner-supplied export
Unit 15 - Construction of a 1984sq.m double portal frame building for the purposes of the bonded storage of spirits.
1,984 m²Builder named
22 Jun 2022
CN0082237WD BCMS owner-supplied export
Unit 14 - Construction of a 1984sq.m industrial unit for the purposes of bonded storage of spirits
1,984 m²Builder named
14 Oct 2021
CN0082232WD BCMS owner-supplied export
Unit 13 - Construction of a 1984sq.m double portal frame industrial unit for the purposes of the bonded storage of spirits.
1,984 m²Builder named
14 Oct 2021
CN0082226WD BCMS owner-supplied export
Unit 12 - Construction of a 1984sq.m double portal industrial unit for the purposes of the bonded staorage of spirits.
1,984 m²Builder named
14 Oct 2021
CN0082186WD BCMS open-data feed
Unit 11 - Construction of a 1984sq.m double portal frame building for the purposes of the bonded storage of spirits.
1,984 m²Builder not named
14 Oct 2021
CN0081609WD BCMS owner-supplied export
Unit 21 - Construction of a 992sq.m single portal warehouse for the purposes of the storage of spirits
992 m²Builder named
29 Sep 2021
CN0081651WD BCMS owner-supplied export
Unit 20 - Construction of a 992 sq.m single portal warehouse for the purposes of the storage of spirits
992 m²Builder named
27 Sep 2021
SN0006334WD BCMS open-data feed
Erection of 1 no 992sq.m warehouse unit comprising part of a 16 unit warehouse development for the pruposes of maturation of whiskey together with all associated and ancillary site works.
992 m²Builder not named
12 Jul 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
29 Jun 2022 · Latest notice
2 unique events
Killarney, Kerry · Kerry County Council · Planning ref 201237
Construction of 10no. Apartments & 2no.Duplex ICF Units
Reconciled event scale
12 units · 1,293 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0007362KY BCMS open-data feed
Construction of 5no. Apartments & 1no.Duplex ICF Units (Block B)
6 units · 675 m²Builder not named
29 Jun 2022
SN0007361KY BCMS open-data feed
Construction of 10no. Apartments & 2no.Duplex ICF Units
12 units · 1,293 m²Builder not named
29 Jun 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
27 Jun 2022 · Latest notice
2 unique events
Cobh, Cork · Cork County Council · Planning ref 20/5135
This project consists of the development of 6 no. Blocks that consist of duplex buildings. The buildings will be constructed of ICF type construction. There are 6no. Blocks as follows: Block A: Units 1-3 Meadow Grove Block B: Units 4-9 Meadow Grove Block C: Units 10-15 Meadow Grove Block E: Units 19-21 Meadow Grove Block F: Units 22-27 Meadow Grove Block G: Units 28-30 Meadow Grove
Reconciled event scale
6 units · 2,618.2 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Bardsley Developments Ltd
Unique event Works stated Scale Commenced
CN0090779CC BCMS owner-supplied export
The project consists of the development of 3 no. two-storey townhouses (Block D - Units 16-18 Meadow Grove), with all associated services and site development works.
3 units · 821.4 m²Builder named
27 Jun 2022
CN0090499CC BCMS open-data feed
This project consists of the development of 6 no. Blocks that consist of duplex buildings. The buildings will be constructed of ICF type construction. There are 6no. Blocks as follows: Block A: Units 1-3 Meadow Grove Block B: Units 4-9 Meadow Grove Block C: Units 10-15 Meadow Grove Block E: Units 19-21 Meadow Grove Block F: Units 22-27 Meadow Grove Block G: Units 28-30 Meadow Grove
6 units · 2,618.2 m²Builder not named
20 Jun 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
09 May 2022 · Latest notice
2 unique events
Whitegate, Cork · Cork County Council · Planning ref 17/07117
Construction of 11No dwelling houses (No's: 21, 72, 73, 89, 90, 91, 92, 93, 94, 95, 96) and all associated site works, including vehicular access, parking, footpaths, drainage, landscaping and amenity areas
Reconciled event scale
19 units · 2,210 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0089048CC BCMS open-data feed
Construction of 11No dwelling houses (No's: 21, 72, 73, 89, 90, 91, 92, 93, 94, 95, 96) and all associated site works, including vehicular access, parking, footpaths, drainage, landscaping and amenity areas
11 units · 1,470 m²Builder not named
09 May 2022
CN0086592CC BCMS open-data feed
Construction of 19No dwellings houses (No's: 11, 12, 70, 71, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87 & 88) and all associated site works, including vehicular access, parking, footpaths, drainage, landscaping and amenity areas
19 units · 2,210 m²Builder not named
01 Mar 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Apr 2022 · Latest notice
2 unique events
Dublin, Dublin · Fingal County Council · Planning ref FW20A/0084
At 2, 4, 6 & 8 Barnwell Walk, 37 & 39 Barnwell Road, 12 & 14 Station Road, 1 & 3 Barnwell Heath & 11-18 incl. Hansfield Square, Hansfield, Dublin 15, the construction of 15 no. houses of masonry construction with concrete ground floors and tiled pitched roofs.
Unique event Works stated Scale Commenced
CN0088829FL BCMS owner-supplied export
The construction of (a) the shell-and- core only of a 2-storey building containing a medical centre and a creche and (b) the shell- and-core only of one single-storey building containing a place of worship. Both are of masonry construction with concrete ground floors and tiled pitched roofs.
615 m²Builder named
28 Apr 2022
CN0082662FL BCMS open-data feed
At 2, 4, 6 & 8 Barnwell Walk, 37 & 39 Barnwell Road, 12 & 14 Station Road, 1 & 3 Barnwell Heath & 11-18 incl. Hansfield Square, Hansfield, Dublin 15, the construction of 15 no. houses of masonry construction with concrete ground floors and tiled pitched roofs.
15 units · 1,965 m²Builder not named
21 Oct 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
06 Apr 2022 · Latest notice
4 unique events
Lahinch, Clare · Clare County Council · Planning ref P20/175
Construction of house numbers 35-42 inclusive Cill Stuifin, School Road, Lahinch, Co. Clare and associated roads and services.
Reconciled event scale
8 units · 1,004 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0087737CE BCMS open-data feed
Construction of house numbers 35-42 inclusive Cill Stuifin, School Road, Lahinch, Co. Clare and associated roads and services.
8 units · 1,004 m²Builder not named
06 Apr 2022
CN0083680CE BCMS open-data feed
Construction of house numbers 29-34 inclusive, Cill Stuifin, School Road, Lahinch, Co. Clare and associated roads and services.
6 units · 712 m²Builder not named
26 Nov 2021
CN0081498CE BCMS open-data feed
Construction of house number 23-28 inclusive at Cill Stuifin, Schooll Road, Lahinch.
6 units · 734 m²Builder not named
29 Sep 2021
CN0075578CE BCMS open-data feed
Construction of house no. 16-22 (7 no.) Cill Stuifin, School Road, Lahinch, Co. Clare.
7 units · 829 m²Builder not named
14 May 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build Extension Material alteration Change of use
31 Mar 2022 · Commenced
1 unique event
Dublin, Dublin · Dublin City Council · Planning ref GSDZ2346/19
Material alterations and extension to existing building to form Academic Hub and Library at North House, TU Dublin Campus, Grangegorman Lower, Dublin 7
New build
21 Mar 2022 · Commenced
1 unique event
Little Island, Cork · Cork County Council · Planning ref 17/04638
Construction of a Distribution Centre with Ancillary Offices and Associated Site Works
Material alteration
10 Mar 2022 · Commenced
1 unique event
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref 115/19 GRANTED SECTION 5.
Building 1, Dundrum Town Centre: Material alterations and associated works at Basement, Level G, Level 2, Level 2M, Level 3 and Level 4
New build
04 Mar 2022 · Latest notice
2 unique events
Ladysbridge, Cork · Cork County Council · Planning ref ABP-310585-21 [20/6881]
Construction of 18 No. Two Storey Dwellings at Rathcallan, Ladysbridge, Co. Cork. [House Nos 14-31]
Reconciled event scale
18 units · 2,496 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0086668CC BCMS open-data feed
Construction of 18 No. Two Storey Dwellings at Rathcallan, Ladysbridge, Co. Cork. [House Nos 14-31]
18 units · 2,496 m²Builder not named
04 Mar 2022
CN0084079CC BCMS open-data feed
Construction of 14 No. Two Storey Dwellings at Rathcallan, Ladysbridge, Co. Cork. [House Nos 1-13 & 32]
14 units · 2,180 m²Builder not named
06 Dec 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
22 Feb 2022 · Latest notice
2 unique events
Termonfeckin, Louth · Louth County Council · Planning ref 21286
Construction of dwellings 63-75 Balfeddock Manor, Termonfeckin, Co. Louth
Reconciled event scale
13 units · 1,544.9 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0086238LH BCMS open-data feed
Dwellings 76,77,78,79,80,81,82 and 83 Balfeddock Manor, Termonfeckin, Co. Louth
4 units · 1,425.2 m²Builder not named
22 Feb 2022
CN0082096LH BCMS open-data feed
Construction of dwellings 63-75 Balfeddock Manor, Termonfeckin, Co. Louth
13 units · 1,544.9 m²Builder not named
11 Oct 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
01 Feb 2022 · Latest notice
2 unique events
Prosperous, Kildare · Kildare County Council · Planning ref 18/1100
The construction of 12 No. new dwellings at Main Street, Prosperous, Co. Kildare.
Reconciled event scale
12 units · 2,016 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0085542KE BCMS open-data feed
The construction of 12 No. new dwellings at Main Street, Prosperous, Co. Kildare.
12 units · 2,016 m²Builder not named
01 Feb 2022
CN0085020KE BCMS open-data feed
The construction of 13-16, Main Street, Prosperous
4 units · 637.9 m²Builder not named
19 Jan 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Material alteration Change of use
24 Jan 2022 · Commenced
1 unique event
Long Mile Road, Dublin · Dublin City Council · Planning ref 3577/20
Office development (fit out of existing fallow space to offices) at the rear of Long Mile Works, Long Mile Road, Dublin 12.
New build
21 Jan 2022 · Latest notice
2 unique events
Lusk, Dublin · Fingal County Council · Planning ref F16A/0577, F21A/0217
Construction of 1 no. building comprising 16 no. new apartment and duplex dwellings with associated site works, 1-16 (inclusive) kilhedge Court, Kilhedge Lane, Lusk, Fingal.
Reconciled event scale
18 units · 2,024 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0085327FL BCMS owner-supplied export
Construction of 1 no. building comprising 16 no. new apartment and duplex dwellings with associated site works, 1-16 (inclusive) kilhedge Court, Kilhedge Lane, Lusk, Fingal.
16 units · 1,536 m²Builder not named
21 Jan 2022
CN0080868FL BCMS open-data feed
Construction of 18 no. new dwellings and associated site works, 1-9 (inclusive) kilhedge Drive, 18-26 (inclusive) Kilhedge drive, Kilhedge Lane, Lusk, Co. Dublin.
18 units · 2,024 m²Builder not named
03 Sep 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
19 Jan 2022 · Latest notice
3 unique events
Dublin 8, Dublin · Dublin City Council · Planning ref 4284/17
Works will consist of the demolition of the existing 3 to 4 no. storey Harbour House building along the southern boundary of the plot and the existing 2-storey light industrial warehouse at the rear of the site to enable site investigation works.
Reconciled event scale
4 units · 7,085 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
United Metals Recycling (Ireland) Ltd
Unique event Works stated Scale Commenced
CN0085028DC BCMS open-data feed
Construction of a six number storey over basement, 175 bedroom hotel of approximately 5,775 square metres with terraces at the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8.
7,085 m²Builder not named
19 Jan 2022
CN0083064DC BCMS owner-supplied export
Construction of a six number storey over basement, 175 bedroom hotel of approximately 5,775 square metres with terraces at the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8.
7,085 m²Builder not named
09 Nov 2021
CN0055591DC BCMS owner-supplied export
Works will consist of the demolition of the existing 3 to 4 no. storey Harbour House building along the southern boundary of the plot and the existing 2-storey light industrial warehouse at the rear of the site to enable site investigation works.
4 units · 1,300 m²Builder named
20 Aug 2019
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build Extension
04 Jan 2022 · Latest notice
2 unique events
Shannon, Clare · Clare County Council · Planning ref 21/611
Alterations to the existing elevations of Bay 137, with subdivision into 4 no. Business Technology and Innovation units.
Unique event Works stated Scale Commenced
CN0084863CE BCMS owner-supplied export
Alterations to the existing elevations of Bay 137, with subdivision into 4 no. Business Technology and Innovation units.
4 units · 1,390 m²Builder named
04 Jan 2022
CN0084858CE BCMS owner-supplied export
Alterations to the existing elevations of Bay 135, with the construction of 15sqm new floor area with subdivision into 3 no. Advanced Manufacturing Units – consisting of a single story high- industrial floor with ancillary office area.
3 units · 1,730 m²Builder named
04 Jan 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
04 Jan 2022 · Commenced
1 unique event
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D20A/0408
Development of a three storey nursing home building (aged care facility), to accommodate 150 no. bedrooms and ancillary resident and staff facilities and a plant area at roof level