Site start
Housing site start — Dublin
Dublin 8, Dublin
3 commencement notices · latest start date 19 Jan 2022 · planning reference given
Planning 4284/17
- Commencement notices
- 3
- Latest start date
- 19 Jan 2022
- Latest notice
- 7,085 m²
- Planning reference
- 4284/17
- Location
- Dublin 8, Dublin
Location
Where the site is
- Area
- Dublin 8, Dublin
- County
- Dublin
Addresses on the notices
- the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8
- the rear of the site to enable site investigation works
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a six number storey over basement, 175 bedroom hotel of approximately 5,775 square metres with terraces at the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8.
Floor area stated for this source: 7,085 m².
Construction of a six number storey over basement, 175 bedroom hotel of approximately 5,775 square metres with terraces at the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8.
Floor area stated for this source: 7,085 m².
Works will consist of the demolition of the existing 3 to 4 no. storey Harbour House building along the southern boundary of the plot and the existing 2-storey light industrial warehouse at the rear of the site to enable site investigation works.
Floor area stated for this source: 1,300 m².
Source unit value with scope not stated: 4 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.