Site start

Housing site start — Dublin

Dublin 8, Dublin

3 commencement notices · latest start date 19 Jan 2022 · planning reference given

Planning 4284/17

Commencement notices
3
Latest start date
19 Jan 2022
Latest notice
7,085 m²
Planning reference
4284/17
Location
Dublin 8, Dublin

Location

Where the site is

Area
Dublin 8, Dublin
County
Dublin

Addresses on the notices

  • the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8
  • the rear of the site to enable site investigation works

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of a six number storey over basement, 175 bedroom hotel of approximately 5,775 square metres with terraces at the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 7,085 m².

Planning reference 4284/17
Notice 2 Commencement notice (owner-supplied)

Construction of a six number storey over basement, 175 bedroom hotel of approximately 5,775 square metres with terraces at the fourth floor facing south and east at 17 Portobello Harbour and Portobello College, Portobello Harbour, Dublin 8.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 7,085 m².

Planning reference 4284/17
Notice 3 Commencement notice (owner-supplied)

Works will consist of the demolition of the existing 3 to 4 no. storey Harbour House building along the southern boundary of the plot and the existing 2-storey light industrial warehouse at the rear of the site to enable site investigation works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,300 m².

Source unit value with scope not stated: 4 houses. It is not presented as notice-specific scale.

Planning reference 4284/17

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.