Commencements / complete inventory / Ranked / relevance Index refreshed nightly · 01 Aug 2026

Complete commencement inventory

Every commencement project, and every notice underneath it

The full retained public-safe commencement history, grouped by exact planning authority and full planning reference. Duplicate source representations are consolidated into unique commencement events; switch to Notices to inspect every source row.

138,265 Projects grouped by planning ref
153,613 Notice identities individual source notices
9,840 Multi-notice projects phased or revised starts
42,039 Named-builder notices builder stated on the notice
11,652 In this window 12 months · 12,768 notices
Filters Show / hide

Showing 951–975 of 12,768 notices

Source notice rowWorks statedPlanning refScaleCommenced
CN0133642SDBCMS owner-supplied export · South Dublin County CouncilBuilder named on notice DUB 16 Regional Network Gateway (RNG) which will comprise of“DUB 16 Regional Network Gateway (RNG) which will comprise of: Single story Main building, ESB Substation, a Pump House and 2 Modular Electrical Rooms and all associated site development works and associated ancillary works.” SD24A/0166WPlanning ref indexed 1,298.7 m² 25 Sep 2025
CN0133460LLBCMS owner-supplied export · Limerick City and County CouncilBuilder not named Demolition of existing school and temporay accommodation“Demolition of existing school and temporay accommodation, construction of new 32 classoom primary school and all ancillary works including relocation of existing temporay accommodation during construction works.” 21/660Planning ref indexed 5,516 m² 22 Sep 2025
CN0133620GYBCMS owner-supplied export · Galway City CouncilBuilder named on notice Cleanroom and GMA fit out — Castlegar“Cleanroom and GMA fit out” 23120Planning ref indexed 1,119 m² 19 Sep 2025
CN0133797FLBCMS owner-supplied export · Fingal County CouncilBuilder named on notice Change of use of shop to two no — Balbriggan“Change of use of shop to two no. apartments under planning exemption CU/25/002” Planning ref not indexed 2 units · 190 m² 19 Sep 2025
CN0133362KEBCMS owner-supplied export · Kildare County CouncilBuilder named on notice 2 — Celbridge“2.No light industrial warehouse units” 24/87Planning ref indexed 3,388 m² 18 Sep 2025
SN0013020SDBCMS open-data feed · South Dublin County CouncilBuilder not named “DUB41”, Information Communication Technology (ICT) facility“Construction of “DUB41”, Information Communication Technology (ICT) facility comprising of a 2-storey ICT block, a 3-storey administration and technical block and a 3 and a half storey plant level on the DUB40 site, Milltown, Peamount Road, Newcastle Co Dublin.” SD20A/0324Planning ref indexed 16,135 m² 10 Sep 2025
CN0132919SOBCMS owner-supplied export · Sligo County CouncilBuilder named on notice Phase 2 of 2 - Construction of an extension (4019m2) over five“Phase 2 of 2 - Construction of an extension (4019m2) over five storeys with connections to the existing hospital, new entrance with a covered ramp and all associated site works.” PL 18/392 & PL 22/60012Planning ref indexed 4,020 m² 08 Sep 2025
CN0132884WHBCMS owner-supplied export · Westmeath County CouncilBuilder named on notice A new Advanced Building Solution consisting of office and light“Construction of a new Advanced Building Solution consisting of office and light industrial/production spaces and vehicular/pedestrian entrance, signage, car parking, new timber and post rail boundaries, cycle shelters, landscaping, gas skid, underground storage tank, independent ESB substation and switch room building, access road and all associated site works.” 22/347Planning ref indexed 4,763 m² 05 Sep 2025
SN0013006DCBCMS open-data feed · Dublin City CouncilBuilder not named Crumlin Shopping Centre Redevelopment – The construction of a“Crumlin Shopping Centre Redevelopment – The construction of a new shopping centre and associated works. The construction will be broken into 3 phases. Phase 1 – Construction of the main Dunnes unit finished to shell and core standard to allow the fit-out of the unit to take place (under a separate FSC application and Commencement Notice). Phase 2 – Construction and completion of 6 no. retail units to shell and core standard along with the completion of the mall and public toilets. Phase 3 – Demolition of the existing Dunnes unit and construction of a new food hall to shell and core standard. The phasing plan, including phasing drawings, can be viewed in the Supporting Documents section (under AI1.1-Phasing Plan and AI1.2-Phasing Drawings) with this 7 Day Commencement Notice. The fit-out of the substation building for M&E services will also be completed. Please note that the existing Dunnes unit will remain open to trade until the beginning of Phase 3.” 3372/23Planning ref indexed 16,892.8 m² 04 Sep 2025
CN0132656FLBCMS open-data feed · Fingal County CouncilBuilder not named Ryanair DAC development which will consist of the construction“Ryanair DAC development which will consist of the construction of a single-storey, part two-storey four-bay hangar designed to accommodate up to 4 no. Code C Aircraft, with associated maintenance facilities, ancillary offices and staff areas” F23A/0245Planning ref indexed 10,152.9 m² 01 Sep 2025
CN0132472DCBCMS owner-supplied export · Dublin City CouncilBuilder named on notice Change of use of Rockfield House from existing vacant“Change of use of Rockfield House from existing vacant convalescent home to hospital admin. facilities, incl. refurbishment of building, Exist GFA: 805.9m², Prop GFA:866.6m². Incl. ESB substation to rear of Beaumont Convent GFA: 28.1m².” 4899/22Planning ref indexed 1,700.6 m² 25 Aug 2025
CN0132301MOBCMS owner-supplied export · Mayo County CouncilBuilder named on notice Refurbishment of existing accommodation into 2No apartments on“Refurbishment of existing accommodation into 2No apartments on first floor of existing building at Spencer St Castlebar.” Planning ref not indexed 2 units · 277 m² 22 Aug 2025
CN0132015OYBCMS owner-supplied export · Offaly County CouncilBuilder named on notice The proposed development comprises the demolition and“The proposed development comprises the demolition and repositioning of an existing external store, and the construction of a new three-storey extension (c.2055m2) and minor internal alteration to layout of the existing building of Coláiste Choilm, O’Moore Street, Tullamore, Co. Offaly. The proposed extension provides general classrooms, specialist rooms and a two (2) class base Special Education Needs (SEN) unit and associated ancillary accommodation. The development will also include: Redevelopment of the existing car park to provide additional car and bicycle parking spaces; Alterations to the existing boundary treatments; Provision of new footpaths, an external play area, landscaping, and all associated site works and service connections required to support the development.” 22/174Planning ref indexed 2,055 m² 12 Aug 2025
CN0132056SDBCMS owner-supplied export · South Dublin County CouncilBuilder named on notice Change of use from Warehouse to Data Repository Facility and“Change of use from Warehouse to Data Repository Facility and associated site works.” SD22A/0460 ABP-317918-23Planning ref indexed 2,445 m² 11 Aug 2025
CN0131885DLBCMS owner-supplied export · Donegal County CouncilBuilder named on notice Repurposing an existing workshop to form a new apprenticeship“REPURPOSING AN EXISTING WORKSHOP TO FORM A NEW APPRENTICESHIP FACILITY, ALONGSIDE ASSOCIATED SITE WORKS” 24/ 62055Planning ref indexed 1,660 m² 05 Aug 2025
CN0131627MOBCMS owner-supplied export · Mayo County CouncilBuilder named on notice A 2-story respite healthcare / hotel facility — Cong“Construction of a 2-story respite healthcare / hotel facility. The ground floor consists of 3 playrooms, gym facility, hairdressers, 3 therapy rooms, WCs, store room, arts room, dining room, cinema/activity room, rest room, kitchen, boiler house, switch room, laundry room, and staff changing room. The first floor consists of 17 bedrooms, 17 bathrooms, 14 shower rooms, 1 communal office, 2 offices, cot store, linen store and a cleaner’s room.” P17/585, 17/5850, 24/60297Planning ref indexed 2,944 m² 04 Aug 2025
CN0143914WWBCMS open-data feed · Wicklow County CouncilBuilder not named Block 5 (615 — Newtown Mount Kennedy“Block 5 (615.8m2) which includes 3 no. ground floor apartments & 3 no. upper floor duplex apartment units each with external access, this detached building is part of a wider residential development located at Main Street, Killmacullagh, Newtownmountkennedy, Co. Wicklow.” 23/175 ABP-317785-23Planning ref indexed 6 units · 615.8 m² 06 Jul 2026
CN0144029CYBCMS open-data feed · Cork City CouncilBuilder not named 6no — Ballincrokig“Construction of 6no. houses at Coppenger Woods, Dublin Pike, Ballincrokig, Cork. [House Nos 49-54]” ABP-320996-24 [24/42789]Planning ref indexed 6 units · 744.6 m² 26 Jun 2026
CN0143493CCBCMS owner-supplied export · Cork County CouncilBuilder named on notice Alteration and change of use of the 1st floor accommodation and“Alteration and change of use of the 1st floor accommodation and restaurant area to 2 no. holiday units for short-term letting, construction of a first floor extension, alterations to the elevation, removal of a chimney and relocation of external masonry retaining wall for the installation of a prefabricated storage shed to provide ancillary storage for the bar and restaurant and all associated site works at licensed premises (public house).” 255256Planning ref indexed 2 units · 401 m² 24 Jun 2026
CN0143920WHBCMS open-data feed · Westmeath County CouncilBuilder not named 1st phase of the development will consist of construction of“1st phase of the development will consist of construction of total 7 no. units - 3 units in Block 1(H.N.1,2,3), 2 units in Block D (H.N 23,24) and 2 units in Block E (25,26) out of the total 26 units. Other units to be constructed in next phase.” 2360333Planning ref indexed 7 units · 989.1 m² 22 Jun 2026
SN0014297DCBCMS open-data feed · Dublin City CouncilBuilder not named Material alterations to existing amenity spaces and rooms to“Material alterations to existing amenity spaces and rooms to create 9 new student accommodation studios, a study room and a Cinema Room” WEB5696/25Planning ref indexed 9 units · 380.3 m² 11 Jun 2026
CN0143247DRBCMS owner-supplied export · Dun Laoghaire Rathdown County CouncilBuilder named on notice New Building comprising 4 No Apartments — Dublin 18“New Building comprising 4 No Apartments” D25A/0636/WEBPlanning ref indexed 4 units · 360 m² 11 Jun 2026
CN0143778KEBCMS open-data feed · Kildare County CouncilBuilder not named 9 No Houses at Fern's Walk, Monasterevin, Co“Construction of 9 No Houses at Fern's Walk, Monasterevin, Co. Kildare” 25/60658Planning ref indexed 9 units · 993.3 m² 08 Jun 2026
CN0143411CNBCMS open-data feed · Cavan County CouncilBuilder not named Construct 7 no — Ballyjamesduff“Construct 7 no. dormer style dwellings (6no. 3 bed semi-detached, and 1 no. 3 bed detached) with entrance, service road, and all associated & ancillary works” 20/616Planning ref indexed 7 units · 929 m² 03 Jun 2026
CN0143188CNBCMS owner-supplied export · Cavan County CouncilBuilder named on notice Dwelling house, attached carport and domestic garage and all“Erection of dwelling house, attached carport and domestic garage and all ancillary works.” 2360163Planning ref indexed 2 units · 319.5 m² 03 Jun 2026

Counting and privacy. Projects group only where the exact canonical planning authority and full planning reference match. Known official wrappers around the same full CN/SN reference are one event; different dated commencement events remain separate. Highest unconflicted event units and floor area are shown, never summed. Personal names, contact details, Eircodes and raw private addresses remain outside this public projection.

Keep this commencement search working

Create an alert for this exact filter set, inspect only the mapped public locations, or use the weekly briefing. Unmatched planning references remain visibly source-limited.