New build
23 Sep 2026 · Latest notice
3 unique events
Balgriffin, Dublin · Fingal County Council · Planning ref F25A/0663E
Construction of 38no. dwellings at Le Rondini Carrs Lane Balgriffin Dublin 17
Unique event Works stated Scale Commenced
SN0014859FL BCMS open-data feed
Construction of 1 No. Apartment Block, Consisting of 12 No. apartments at Le Rondini Carr's Lane Belcamp, Dublin 17
12 units · 1,177.8 m²Builder not named
23 Sep 2026
SN0014848FL BCMS open-data feed
Construction of 1 No. Apartment Block, Consisting of 10 No. apartments at Le Rondini Carr's Lane Balgriffin Dublin 17
10 units · 1,089.6 m²Builder not named
23 Sep 2026
CN0142251FL BCMS owner-supplied export
Construction of 38no. dwellings at Le Rondini Carrs Lane Balgriffin Dublin 17
38 units · 4,640 m²Builder named
13 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Sep 2026 · Latest notice
24 unique events
Douglas, Cork · Cork City Council · Planning ref ABP-307041-20
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
Unique event Works stated Scale Commenced
SN0014823CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block R, No's 01 & 02 The Lawns, Belview Wood. This is Phase 2c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
18 Sep 2026
CN0147372CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block Q, No's 42 & 43, The View, Belview Wood. This is Phase 2b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
16 Sep 2026
CN0120061CY BCMS open-data feed
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
121 units · 11,298.6 m²Builder not named
30 Sep 2024
SN0010228CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block N, No's 07, 08, 09 & 10, The Heights, Belview Wood. This is Phase 1Q of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010200CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block L, No's 01 & 02, The Heights, Belview Wood. This is Phase 1o of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010187CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block O, No's 11 & 12, The Heights, Belview Wood. This is Phase 1R of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010185CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block P, No's 22 & 23, The View, Belview Wood. This is Phase 1S of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010182CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block M, No's 03, 04, 05 & 06, The Heights, Belview Wood. This is Phase 1P of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010179CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block I, No's 36 & 37, The Green, Belview Wood. This is Phase 1L of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010174CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block J, No's 32 & 33, The Green, Belview Wood. This is Phase 1M of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010173CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block K, No's 20 & 21, The View, Belview Wood. This is Phase 1n of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010172CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block G, No's 18, 19, 20 & 21, The Green, Belview Wood. This is Phase 1J of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010171CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block F, No's 14, 15, 16 & 17, The Green, Belview Wood. This is Phase 1I of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010170CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block H, No's 22 & 23, The Green, Belview Wood. This is Phase 1K of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
CN0113810CY BCMS open-data feed
The construction of 129 no. 2/3 storey dwelling houses and associated site works. This is Phase 1H of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
129 units · 12,994.2 m²Builder not named
24 Apr 2024
CN0113651CY BCMS open-data feed
The construction of 36 no 2-storey dwelling houses and associated site works. This is Phase 1g of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
36 units · 3,339.9 m²Builder not named
24 Apr 2024
SN0009928CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block D, No's 42 & 43, The Green, Belview Wood. This is Phase 1e of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009909CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block C, No's 46 & 47, The Green, Belview Wood. This is Phase 1d of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009903CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block E, No's 11 & 12, The Green, Belview Wood. This is Phase 1f of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009742CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 9 & 10, The Green, Belview Wood. This is Phase 1b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
SN0009741CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 1 & 2, The Green, Belview Wood. This is Phase 1a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
CN0110170CY BCMS open-data feed
The construction of 8 no 2-storey dwelling houses and associated site works. This is Phase 1c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
8 units · 696.6 m²Builder not named
22 Feb 2024
CN0108602CY BCMS open-data feed
The construction of 19 no 2/3 storey dwelling houses and associated site works. This is Phase 1 of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
19 units · 2,308.4 m²Builder not named
02 Jan 2024
CN0080886CY BCMS owner-supplied export
Construction of 6No. Residential Units (Numbers 10, 11, 12, 14, 15 & 16) and all associated Site Works at 'The Mews', Belview Wood, Maryborough, Douglas, Co. Cork.
3,136.8 m²Builder named
13 Sep 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Sep 2026 · Latest notice
8 unique events
Waterford, Waterford · Waterford City and County Council · Planning ref 2560299
23 Dwelling houses
Reconciled event scale
24 units · 2,808 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Liam Neville Developments
Unique event Works stated Scale Commenced
CN0147750WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147749WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147736WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147734WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147606WD BCMS open-data feed
8 Dwelling houses
8 units · 936 m²Builder not named
18 Sep 2026
CN0145124WD BCMS open-data feed
16 Dwelling Houses
16 units · 1,872 m²Builder not named
27 Jul 2026
CN0141402WD BCMS owner-supplied export
23 Dwelling houses
2,691 m²Builder named
01 May 2026
CN0136842WD BCMS owner-supplied export
Construction of 24no 2 storey residential units
24 units · 2,808 m²Builder named
26 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
11 Sep 2026 · Latest notice
8 unique events
Knockatee, Dublin · Fingal County Council · Planning ref LRD0018/S3E
Phase 1a consisting of 75 No. houses comprising of: 4 No. two bedroom houses, 54 No. three bedroom houses and 17 No. four bedroom houses These range in height from two to three store and include semi- detached and terraced houses.
Reconciled event scale
52 units · 8,427.1 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Cairn Homes Construction Ltd
Unique event Works stated Scale Commenced
SN0014796FL BCMS open-data feed
Construction of Block 11, a Four Storey (Ground plus 3) residential block located off Holybanks Avenue on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains ancillary sprinkler plant and water storage area
42 units · 3,571.9 m²Builder not named
11 Sep 2026
SN0014400FL BCMS open-data feed
Construction of Block 3, a Five Storey (Ground plus 4) residential block located off Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains Ancillary Bike storage / Plant use.
52 units · 4,412 m²Builder not named
26 Jun 2026
SN0014307FL BCMS open-data feed
Construction of Block 2, a Five Storey (Ground plus 4) residential block located of Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains Ancillary Bike storage / Plant use.
52 units · 4,411.8 m²Builder not named
10 Jun 2026
SN0014170FL BCMS open-data feed
Construction of Block 1, a Five Storey (Ground plus 4) residential block located of Holybanks Boulevard on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a Ancillary Bike storage / Plant use.
38 units · 3,435 m²Builder not named
13 May 2026
SN0014089FL BCMS open-data feed
Construction of Block 5, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a community use which will be completed to shell and core standard.
27 units · 3,192.8 m²Builder not named
27 Apr 2026
CN0141585FL BCMS owner-supplied export
Phase 2 consisting of 16 No. back-to- back Townhouses comprising of: 16 No. three bedroom three storey houses.
1,880.5 m²Builder named
27 Apr 2026
SN0014010FL BCMS open-data feed
Construction of Block 4, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place Accessed from Glen Ellan Road, Swords, County Dublin. Block 04 will comprise of 27 no. residential apartment units. The building has a communal secure bicycle store at ground floor level. A Meter Room and Plant room are also located at ground floor level. The Retail Space and Creche will be completed to a shell finish. The Retail Space and Creche fit out will completed under a separate Commencement Notice.
27 units · 3,231.1 m²Builder not named
08 Apr 2026
CN0137143FL BCMS owner-supplied export
Phase 1a consisting of 75 No. houses comprising of: 4 No. two bedroom houses, 54 No. three bedroom houses and 17 No. four bedroom houses These range in height from two to three store and include semi- detached and terraced houses.
8,427.1 m²Builder named
05 Jan 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Sep 2026 · Latest notice
2 unique events
Waterford, Waterford · Waterford City and County Council · Planning ref 2560394
Housing development at Knightswood, Williamstown, Waterford - Ph3(52units)
Unique event Works stated Scale Commenced
CN0147207WD BCMS open-data feed
Duplex units development at 59-76 Knightswood Walk, Ph3 Knightswood
3 units · 523.1 m²Builder not named
10 Sep 2026
CN0139433WD BCMS owner-supplied export
Housing development at Knightswood, Williamstown, Waterford - Ph3(52units)
6,850.0 m²Builder named
14 Mar 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
09 Sep 2026 · Latest notice
5 unique events
Shankill, Dublin · Dun Laoghaire Rathdown County Council · Planning ref LRD24A/0382
Construction of 129no houses and all associated site works as part of the overall development described in planning permission LRD24A/0382 at Woodbrook, Shankill, Co. Dublin
Unique event Works stated Scale Commenced
SN0014755DR BCMS open-data feed
Construction of a new three storey building (Block J) consisting of 18 duplex units and 3 apartment units and all associated site works as described in planning permission ref LRD24A/0382
21 units · 2,723 m²Builder not named
09 Sep 2026
SN0014649DR BCMS open-data feed
Construction of a five storey apartment block consisting of 31no. apartments and all associated site works.
31 units · 3,617.9 m²Builder not named
21 Aug 2026
SN0014437DR BCMS open-data feed
Construction of a 4 storey apartment building consisting of 17no. apartments and all associated site works.
17 units · 1,490.8 m²Builder not named
14 Jul 2026
SN0014044DR BCMS open-data feed
Construction of 5 storey apartment building consisting of 24no. apartments and all associated site works as described in planning permission ref LRD24A/0382
24 units · 2,070 m²Builder not named
22 Apr 2026
CN0127819DR BCMS owner-supplied export
Construction of 129no houses and all associated site works as part of the overall development described in planning permission LRD24A/0382 at Woodbrook, Shankill, Co. Dublin
129 units · 13,969.2 m²Builder named
24 Apr 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
07 Sep 2026 · Latest notice
2 unique events
Portlaoise, Laois · Laois County Council · Planning ref 2560311
Continuation of housing estate, Dargan Woods.The construction of 22 no. house units. The development includes all ancillary works to include an access road and footpaths, public lighting, water servicing including foul and storm water, landscaping and all ancillary site works
Reconciled event scale
22 units · 2,574.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Dargan Woods Devco Ltd; Brook Advantage Ltd; Hazeltip Ltd
Unique event Works stated Scale Commenced
SN0014540LS BCMS open-data feed
Continuation of housing estate, Dargan Woods.The construction of 4 Apartment units. The development includes all ancillary works to include an access road and footpaths, public lighting, water servicing including foul and storm water, landscaping and all ancillary site works
4 units · 265.8 m²Builder not named
07 Sep 2026
CN0142123LS BCMS owner-supplied export
Continuation of housing estate, Dargan Woods.The construction of 22 no. house units. The development includes all ancillary works to include an access road and footpaths, public lighting, water servicing including foul and storm water, landscaping and all ancillary site works
22 units · 2,574.4 m²Builder named
12 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
04 Sep 2026 · Latest notice
6 unique events
Swords, Dublin · Fingal County Council · Planning ref LRD0067/S3E
Construction of 156 no. 2 and 3 storey dwellings on lands to the South of Rathbeale Road, Mooretown, Swords, Dublin.
Unique event Works stated Scale Commenced
CN0147232FL BCMS open-data feed
Construction of a residential apartment block (Block BA04) consisting of 42 no. residential units, over 4 storeys, at Mooretown, Swords, Dublin.
42 units · 1,494.5 m²Builder not named
04 Sep 2026
CN0147231FL BCMS open-data feed
Construction of a residential duplex block (Block BZ04) comprising of 10 No. residential units at Mooretown, Swords, Dublin.
10 units · 1,110.4 m²Builder not named
04 Sep 2026
CN0147230FL BCMS open-data feed
Construction of a residential duplex block (Block BZ03) comprising of 10 No. residential units at Mooretown, Swords, Dublin.
10 units · 973.4 m²Builder not named
04 Sep 2026
CN0147229FL BCMS open-data feed
Construction of a residential duplex block (Block BZ02) comprising of 8 No. residential units at Mooretown, Swords, Dublin.
8 units · 935.8 m²Builder not named
04 Sep 2026
CN0147228FL BCMS open-data feed
Construction of a residential duplex block (Block BZ01) comprising of 10 No. residential units at Mooretown, Swords, Dublin.
10 units · 1,060.7 m²Builder not named
04 Sep 2026
CN0141637FL BCMS owner-supplied export
Construction of 156 no. 2 and 3 storey dwellings on lands to the South of Rathbeale Road, Mooretown, Swords, Dublin.
13,659.6 m²Builder named
29 Apr 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
01 Sep 2026 · Latest notice
12 unique events
Cork, Cork · Cork City Council · Planning ref ABP-306325-20
Construction of neighbourhood 5 of Longview Estates (Árdan View) consisting of addresses 1-68, 93-178 Árdan View, and associated site works.
Unique event Works stated Scale Commenced
CN0146852CY BCMS open-data feed
Construction of Phase 1 in Neighbourhood 4 of Longview Estates consisting of addresses 1-39 Rathárd View, and associated site works.
39 units · 3,792.8 m²Builder not named
01 Sep 2026
SN0014059CY BCMS open-data feed
69-80 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 69-80 Árdan View, Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
23 Apr 2026
SN0014058CY BCMS open-data feed
81-92 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 81-92 Árdan View, Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
23 Apr 2026
CN0127801CY BCMS open-data feed
Construction of neighbourhood 5 of Longview Estates (Árdan View) consisting of addresses 1-68, 93-178 Árdan View, and associated site works.
154 units · 15,540.3 m²Builder not named
21 Apr 2025
CN0120878CY BCMS owner-supplied export
Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.
423.3 m²Builder named
15 Oct 2024
CN0117057CY BCMS owner-supplied export
Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.
Scale not statedBuilder named
15 Jul 2024
SN0010072CY BCMS open-data feed
1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 16no. residential units. Units as follows: 1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork
16 units · 1,500.6 m²Builder not named
19 Apr 2024
SN0010071CY BCMS open-data feed
67-75 Longview Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 9 no. residential units. Units as follows: 67-75 Longview Park - Longview Estates, Ballyvolane, Cork
9 units · 1,046.7 m²Builder not named
19 Apr 2024
SN0010070CY BCMS open-data feed
1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
19 Apr 2024
SN0010069CY BCMS open-data feed
1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 8no. residential units. Units as follows: 1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork
8 units · 755.3 m²Builder not named
19 Apr 2024
CN0113377CY BCMS open-data feed
Construction of dwellings 1-66 Longview Park, consisting of 4 no. two-storey detached houses, 8 no. three-storey detached houses, 44 no. two-storey semi-detached houses, 6 no. three-story semi-detached houses, 4 no. two-story terraced houses in one block of four, and associated site works.
66 units · 7,841.5 m²Builder not named
19 Apr 2024
CN0113330CY BCMS open-data feed
Construction of neighbourhood 2 of Longview Estates (Ráthard) consisting of addresses 13-53 Ráthard Park, 9-47 Ráthard Lawn, 17-55 Ráthard Drive, 1-6 & 12-28 Ráthard Avenue, and associated site works.
142 units · 15,715.3 m²Builder not named
19 Apr 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
29 Aug 2026 · Latest notice
7 unique events
An Uaimh, Meath · Meath County Council · Planning ref 25/60539
Construction of 82 No. 2 storey dwelling houses, at No. 75 - 156 Athlumney, Navan, Co. Meath.
Unique event Works stated Scale Commenced
SN0014688MH BCMS open-data feed
The Construction of a two-storey childcare facility at Sommerville, Navan, Co. Meath.
426.2 m²Builder not named
29 Aug 2026
CN0140561MH BCMS owner-supplied export
Construction of 82 No. 2 storey dwelling houses, at No. 75 - 156 Athlumney, Navan, Co. Meath.
8,692.8 m²Builder named
08 Apr 2026
CN0139588MH BCMS owner-supplied export
Construction of 34 No. 2 storey dwelling houses, at No. 33 - 66 Athlumney, Navan, Co. Meath.
3,832.3 m²Builder named
13 Mar 2026
SN0013786MH BCMS open-data feed
Construction of Duplex Block C, dwelling Nos. 29 - 32 at Athlumney, Navan, Co. Meath. This development consists of 4 No. duplex apartments in a single 3-storey block comprising 2 No. 1 bedroom, single storey apartments at ground floor, and 2 No. 2bedroom, two storey apartments above at first and second floor.
4 units · 309.8 m²Builder not named
25 Feb 2026
CN0138098MH BCMS owner-supplied export
Construction of 8 No. 2 storey dwelling houses, at No. 67 - 74 Athlumney, Navan, Co. Meath. .
834 m²Builder named
06 Feb 2026
CN0138171MH BCMS owner-supplied export
Construction of Duplex Block B, dwelling Nos. 9 - 28 at Athlumney, Navan, Co. Meath. This development consists of 20 No. duplex apartments in a single 3-storey block comprising 4No. 1 bedroom and 6 No. 2 bedroom single storey apartments at ground floor, and 4 No. 2bedroom and 6 No. 3 bedroom 2 storey apartments above at first and second floor.
1,798.2 m²Builder named
05 Feb 2026
CN0138168MH BCMS owner-supplied export
Construction of Duplex Block A, dwellings Nos. 1 - 8 at Athlumney, Navan, Co. Meath. This development consists of 8 No. duplex apartments in a single 3-storey block comprising 4 No. 2 bedroom single storey apartments at ground floor, and 4 No. 3 bedroom 2 storey apartments above at first and second floor.
806 m²Builder named
05 Feb 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
21 Aug 2026 · Latest notice
11 unique events
Blessington, Wicklow · Wicklow County Council · Planning ref 21/1404
Construction of 70 no. two-storey dwellings. Consisting of 38 No. terraced Type 2A Houses (2 Bedroom), 25 No. terraced Type 3A Houses (3 Bedroom), 3 No. terraced Type 3B Houses (3 Bedroom), 2 No. semi-detached Type 3B Houses (3 Bedroom) and 2 No. detached Type 3B Houses (3 Bedroom).
Reconciled event scale
70 units · 6,317.5 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0147106WW BCMS open-data feed
FSC Ref BC 4490/2022, BCMS Ref No. 3007864. Construction of a duplex apartment building to include first unit (Type D1) which is a single storey ground floor apartment accessed directly from outside and a second unit (Type D2) which is an apartment with an independent external entrance via stairs that lead directly to outside at ground level at No.95-96 and No.100-101, Burgage More, Blessington, Co.Wicklow. The building is further identified as part of Terrace 21 within Block 4.
4 units · 234.2 m²Builder not named
21 Aug 2026
CN0147088WW BCMS open-data feed
FSC Ref BC 4486/2022, BCMS Ref No. 3007861. Construction of a duplex apartment building to include first unit (Type D1) which is a single storey ground floor apartment accessed directly from outside and a second unit (Type D2) which is an apartment with an independent external entrance via stairs that lead directly to outside at ground level at No.85-86 and No.90-91, Burgage More, Blessington, Co.Wicklow. The building is further identified as part of Terrace 19 within Block 4.
4 units · 234.2 m²Builder not named
21 Aug 2026
CN0146885WW BCMS open-data feed
FSC Ref BC 4495/2022, BCMS Ref No. 3007858. Construction of a duplex apartment building which includes 2 single storey apartments located on the ground level (Type C1), and 2 single storey apartments located on the first floor (Type C2). All apartments will be accessed directly from the outside at No.62-63 and No.72-73 at Burgage More, Blessington, Co.Wicklow. The building is now identified as No.60-61 and No.70-71, part of Terrace 17 within Block 3.
4 units · 341 m²Builder not named
21 Aug 2026
CN0146784WW BCMS open-data feed
FSC Ref BC 4494/2022, BCMS Ref No. 3007857. Construction of a duplex apartment building which includes 2 single storey apartments located on the ground level (Type C1), and 2 single storey apartments located on the first floor (Type C2). All apartments will be accessed directly from the outside at No.59-60 and No.75-76 at Burgage More, Blessington, Co.Wicklow. The building is now identified as No.73-74 and No.83-84, part of Terrace 15 within Block 3.
8 units · 341 m²Builder not named
21 Aug 2026
CN0147104WW BCMS open-data feed
FSC Ref BC 4492/2022, BCMS Ref No. 3007852. Construction of an apartment building to include 2 single storey apartments located on the ground level (Type A1) and 2 duplexes located over the first and second floor (Type A2). All apartments will be accessed directly from the outside on ground floor at No.45-48 Burgage More, Blessington, Co. Wicklow. The building is now identified as Units 48-51, Terrace 12 within Block 2.
4 units · 149.5 m²Builder not named
18 Aug 2026
CN0147084WW BCMS open-data feed
FSC Ref BC 4491/2022, BCMS Ref No. 3007851. Construction of an apartment building to include 2 single storey apartments located on the ground level (Type A1) and 2 duplexes located over the first and second floor (Type A2). All apartments will be accessed directly from the outside on ground floor at No.41-44 Burgage More, Blessington, Co.Wicklow. The building is further identified as Terrace 10 within Block 2.
4 units · 149.5 m²Builder not named
18 Aug 2026
CN0146778WW BCMS open-data feed
FSC Ref BC 4493/2022, BCMS Ref No. 3007863. Construction of a duplex apartment building to include first unit (Type D1) which is a single storey ground floor apartment accessed directly from outside and a second unit (Type D2) which is an apartment with an independent external entrance via stairs that lead directly to outside at ground level at No.55-56 Burgage More, Blessington, Co. Wicklow. The building is further identified as part of Terrace 13 within Block 2.
2 units · 117.1 m²Builder not named
18 Aug 2026
CN0146411WW BCMS open-data feed
FSC Ref BC 4489/2022, BCMS Ref No. 3007859. Construction of a duplex apartment building to include first unit (Type D1) which is a single storey ground floor apartment accessed directly from outside and a second unit (Type D2) which is an apartment with an independent external entrance via stairs that lead directly to outside at ground level at No.36-37 Burgage More, Blessington, Co. Wicklow. The building is further identified as part of Terrace 09 within Block 2.
2 units · 117.1 m²Builder not named
18 Aug 2026
CN0146036WW BCMS open-data feed
FSC Ref BC 4487/2022, BCMS Ref No. 3007850. Construction of an apartment building to include 2 single storey apartments located on the ground level (Type A1) and 2 duplexes located over the first and second floor (Type A2). All apartments will be accessed directly from the outside on ground floor at No.16-19 Burgage More, Blessington, Co.Wicklow. The building is further identified as Terrace 05 within Block 1.
4 units · 149.5 m²Builder not named
31 Jul 2026
CN0146029WW BCMS open-data feed
FSC Ref BC 4488/2022, BCMS Ref No. 3007849. Construction of an apartment building to include 2 single storey apartments located on the ground level (Type A1) and 2 duplexes located over the first and second floor (Type A2). All apartments will be accessed directly from the outside on ground floor at No.12-15 Burgage More, Blessington, Co.Wicklow. The building is further identified as Terrace 04 within Block 1.
4 units · 149.5 m²Builder not named
31 Jul 2026
CN0146024WW BCMS open-data feed
Construction of 70 no. two-storey dwellings. Consisting of 38 No. terraced Type 2A Houses (2 Bedroom), 25 No. terraced Type 3A Houses (3 Bedroom), 3 No. terraced Type 3B Houses (3 Bedroom), 2 No. semi-detached Type 3B Houses (3 Bedroom) and 2 No. detached Type 3B Houses (3 Bedroom).
70 units · 6,317.5 m²Builder not named
31 Jul 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
21 Aug 2026 · Latest notice
2 unique events
Clonmel, Tipperary · Tipperary County Council · Planning ref 21654
Construction of 20 no. 2 bed bungalows including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
Unique event Works stated Scale Commenced
CN0146559TT BCMS open-data feed
20 no. New 2 bed bungalows and repairs to existing lodge house
21 units · 1,480 m²Builder not named
21 Aug 2026
CN0113534TT BCMS owner-supplied export
Construction of 20 no. 2 bed bungalows including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
1,314 m²Builder named
22 Apr 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
20 Aug 2026 · Latest notice
4 unique events
Cobh, Cork · Cork County Council · Planning ref 24/04072
construction of 22 no. new dwelling houses and associated site works, nos 1-14 The Meadows, 1-8 the close,(all inclusive) Ard Roibín, carrignafoy, Cobh, Co Cork.
Reconciled event scale
21 units · 2,360.5 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
O'Mahony Developments (G) Ltd
Unique event Works stated Scale Commenced
CN0146354CC BCMS open-data feed
Construction of 21 nr. new dwelling units and associated site works, nrs. 14-34 incl., the Inlet, Ard Roibín, carrignafoy, Cobh, Co Cork
21 units · 1,911.8 m²Builder not named
20 Aug 2026
CN0138566CC BCMS owner-supplied export
Construction 14 no new dwelling houses and associated site works, nos. 21 to 34 incl. the close ard roibin carrignafoy cobh co cork
1,437.9 m²Builder named
20 Feb 2026
CN0134442CC BCMS owner-supplied export
The construction of 12 dwelling houses, nos. 9-20 incl., The Close Ard Roibín, Cobh, Co Cork.
1,176.4 m²Builder named
14 Oct 2025
CN0129281CC BCMS owner-supplied export
construction of 22 no. new dwelling houses and associated site works, nos 1-14 The Meadows, 1-8 the close,(all inclusive) Ard Roibín, carrignafoy, Cobh, Co Cork.
2,360.5 m²Builder named
04 Jun 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
20 Aug 2026 · Latest notice
4 unique events
Dublin, Dublin · South Dublin County Council · Planning ref LRD22A/0002
The proposal will consist of the construction of 204 Houses units of Phase 1 of a Mixed Tenure Housing Development of 635 no. residential units.
Reconciled event scale
3 units · 21,832.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
the Arden Team Designated Activity Company (Arden DAC)
Unique event Works stated Scale Commenced
CN0146363SD BCMS open-data feed
Killinarden Plot 25 Community Centre, Construction of a single Storey Shell & Core Community Centre located at Killinarden, Tallaght, Dublin 24.
630.5 m²Builder not named
20 Aug 2026
CN0145016SD BCMS open-data feed
27 Foothills Road, 3 storey duplex located in Killinarden (Plot 21(2)-House Type F, no.3 units), Tallaght, Dublin 24. Each level of the Duplex is accessed independently from the ground level with the first and second floors having there own access stairway. Each apartment is a single bedroom apartment.
3 units · 202 m²Builder not named
20 Jul 2026
SN0014434SD BCMS open-data feed
35 Crestwood Road, Type F, Plot 21(1) - Duplexes at Killinarden, Tallaght, Dublin 24, A proposed three storey duplex located in Killinarden(Plot 21(1) - House Type F, 3no. units), Tallaght, Dublin 24. Each level of the Duplex is accessed independently
3 units · 202 m²Builder not named
10 Jul 2026
CN0123579SD BCMS owner-supplied export
The proposal will consist of the construction of 204 Houses units of Phase 1 of a Mixed Tenure Housing Development of 635 no. residential units.
21,832.4 m²Builder named
17 Dec 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Aug 2026 · Latest notice
6 unique events
Cork, Cork · Cork City Council · Planning ref 24/43209
Construction of residential development of 64 dwelling houses and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Dwelling Houses No's 01 to 64 Waterfall Avenue, Ardrostig, Waterfall, Cork.
Unique event Works stated Scale Commenced
SN0014647CY BCMS open-data feed
Construction of a residential development comprising 27 apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 132–158 (Block 2) Waterfall Avenue, Ardrostig, Waterfall, Cork.
27 units · 2,611 m²Builder not named
18 Aug 2026
SN0014646CY BCMS open-data feed
Construction of a residential development comprising 27 apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 105–131 (Block 1) Waterfall Avenue, Ardrostig, Waterfall, Cork.
27 units · 2,611 m²Builder not named
18 Aug 2026
SN0014120CY BCMS open-data feed
Construction of a residential development comprising 12 duplex apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 93–104 (Duplex 03) Waterfall Avenue, Ardrostig, Waterfall, Cork.
12 units · 1,136.3 m²Builder not named
05 May 2026
SN0014119CY BCMS open-data feed
Construction of a residential development comprising 12 duplex apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 81–92 (Duplex 02) Waterfall Avenue, Ardrostig, Waterfall, Cork.
12 units · 1,136.3 m²Builder not named
05 May 2026
SN0014118CY BCMS open-data feed
Construction of a residential development comprising 16 duplex apartment units and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Units Nos. 65–80 (Duplex 01) Waterfall Avenue, Ardrostig, Waterfall, Cork.
16 units · 1,515.1 m²Builder not named
05 May 2026
CN0136650CY BCMS owner-supplied export
Construction of residential development of 64 dwelling houses and associated site works at Waterfall Avenue, Ardrostig, Waterfall, Cork. Dwelling Houses No's 01 to 64 Waterfall Avenue, Ardrostig, Waterfall, Cork.
214,415.5 m²Builder named
15 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
17 Aug 2026 · Latest notice
12 unique events
Youghal, Cork · Cork County Council · Planning ref Part 8
Proposed Construction of a Residential Development of 28No. dwelling units & all associated Site Works, at Barrack Road, Youghal, Co. Cork
Reconciled event scale
11 units · 3,074 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0145610CC BCMS open-data feed
4 new housing units and associated site works at Dr. Patrick O'Sullivan Terrace, Aghada, Co. Cork
4 units · 423 m²Builder not named
17 Aug 2026
CN0145117CC BCMS open-data feed
7 housing units and associated site works at Park, Knocknagree, Co. Cork
7 units · 477 m²Builder not named
27 Jul 2026
CN0138375CC BCMS owner-supplied export
Proposed Construction of a Residential Development of 28No. dwelling units & all associated Site Works, at Barrack Road, Youghal, Co. Cork
2,382.9 m²Builder named
16 Feb 2026
CN0112523CC BCMS owner-supplied export
Construction of 4 townhouses and 12 apartments and associated works at Sleaveen Road, Macroom.
1,043 m²Builder named
08 Apr 2024
CN0108678CC BCMS open-data feed
The development consists of the construction of 11no. residential housing units, namely Nos 1 - 11 at Uplands Fermoy. The residential units consist of one and two storey houses, both terrace and semi detached in nature as well as hard and soft landscaping works, connection to public utilities and all associated site works.
11 units · 776.8 m²Builder not named
15 Jan 2024
CN0102604CC BCMS owner-supplied export
2 new semi detached dwellings and associated works at 9 & 10 Carrig Rossa, Rossmore, Co. Cork
178 m²Builder named
17 Jul 2023
CN0093741CC BCMS owner-supplied export
Construction of 1 detached dwelling at 2A Glenview Terrace Lyre Cork
95 m²Builder named
24 Sep 2022
CN0090322CC BCMS open-data feed
Block B-Erection of 7 terraced single storey, masonry construction, one bedroom dwellings. Block C-Change of use of School Building to social housing. Construction of 2no. 1 bed dwellings to school building, and 1 single storey extension, masonry construction, one bedroom dwelling.
10 units · 3,074 m²Builder not named
14 Jun 2022
CN0090260CC BCMS owner-supplied export
Change of use of convent to social housing. Construction of 8no. 2 bed apartments over two floors of Convent. Construction of single storey and two storey extensions of masonry construction.
922 m²Builder named
08 Jun 2022
CN0086380CC BCMS owner-supplied export
The development of 2no. two bed, two storey residential units including hard and soft landscaping, connection to public utilities and all associated site works at Doctor Croke Place, Garranmacgarrett, Kilbrin.
162 m²Builder named
28 Feb 2022
CN0076842CC BCMS owner-supplied export
Single Storey extension to Skibbereen Townhall and toilet renovations
61.9 m²Builder named
04 Jun 2021
CN0069681CC BCMS open-data feed
Construction of 4 No. Dwellings including all site development works.
4 units · 348 m²Builder not named
28 Oct 2020
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
14 Aug 2026 · Latest notice
10 unique events
Wexford, Wexford · Wexford County Council · Planning ref 20221652-LRD
Phases 3 to 7, construction of 89 dwellings houses, plot numbers 1 Beechfield Avenue, 3 Beechfield Avenue, 5 to 34 Beechfield Avenue, 1 to 14 Beechfield Close, 1 to 34 Beechfield Crescent & 37 to 45 Beechfield Crescent.
Reconciled event scale
16 units · 10,800 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0146903WX BCMS open-data feed
Construction of Creche Building to Shell & Core, connection to services and all associated site works.
292 m²Builder not named
14 Aug 2026
CN0124171WX BCMS owner-supplied export
Phases 3 to 7, construction of 89 dwellings houses, plot numbers 1 Beechfield Avenue, 3 Beechfield Avenue, 5 to 34 Beechfield Avenue, 1 to 14 Beechfield Close, 1 to 34 Beechfield Crescent & 37 to 45 Beechfield Crescent.
10,800 m²Builder not named
24 Dec 2024
CN0120399WX BCMS owner-supplied export
Phase 3a Construction Of 6 no. Dwelling Houses Plot Nos. 35 to 40 Beechfield Avenue
683.4 m²Builder not named
16 Aug 2024
SN0010582WX BCMS open-data feed
Phase 1, construction of three storey apartment building comprising apartment numbers 1 to 12 Beechfield Court.
12 units · 1,086 m²Builder not named
26 Apr 2024
SN0010581WX BCMS open-data feed
Phase 1, construction of four storey apartment building comprising apartment numbers 1 to 16 Beechfield House.
16 units · 1,448 m²Builder not named
25 Apr 2024
SN0009733WX BCMS open-data feed
Phases 2, construction of 4 maisonette apartment dwellings, plot numbers 5a, 5b, 6a & 6b Beechfield Place.
4 units · 255.4 m²Builder not named
09 Feb 2024
SN0009721WX BCMS open-data feed
Phases 1, construction of 4 maisonette apartment dwellings, plot numbers 50a, 50b, 51a & 51b Beechfield Avenue.
4 units · 255.4 m²Builder not named
09 Feb 2024
SN0009720WX BCMS open-data feed
Phases 2, construction of 4 maisonette apartment dwellings, plot numbers 48a, 48b, 49a & 49b Beechfield Avenue.
4 units · 255.4 m²Builder not named
09 Feb 2024
SN0009716WX BCMS open-data feed
Phases 1, construction of 4 maisonette apartment dwellings, plot numbers 3a, 3b, 4a & 4b Beechfield Place.
4 units · 255.4 m²Builder not named
09 Feb 2024
CN0108668WX BCMS owner-supplied export
Phases 1 & 2, construction of 15 dwellings houses, plot numbers 1 Beechfield Place, 2 Beechfield Place, 7 Beechfield Place, 8 Beechfield Place, 9 Beechfield Place, 10 Beechfield Place, 41 Beechfield Avenue, 42 Beechfield Avenue, 43 Beechfield Avenue, 44 Beechfield Avenue, 45 Beechfield Avenue, 46 Beechfield Avenue, 47 Beechfield Avenue, 35 Beechfield Cresent & 36 Beechfield Cresent.
1,693.8 m²Builder not named
09 Jan 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
11 Aug 2026 · Latest notice
7 unique events
Cork, Cork · Cork City Council · Planning ref ABP-312866-22
Proposed Construction of Block B a 7 storey (Ground + 6) residential development comprising 90 residential units over ground floor ancillary accommodation including a refuse store, bicycle storage, switch room and ESB room at the Creamfields site, junction of Kinsale Road and Tramore Road, Cork.
Reconciled event scale
142 units · 18,646 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0014590CY BCMS open-data feed
Proposed Construction of Block H a Four Storey (Ground, First, Second with rooftop terrace) Residential Duplex Building incorporating Four Ground Floor own door accessed Apartments with Four own odor accessed Duplex units over, including site ancillary works at Kinsale Road and Tramore Road, Cork.
8 units · 1,005.1 m²Builder not named
11 Aug 2026
SN0014455CY BCMS open-data feed
Proposed Construction of Block B a 7 storey (Ground + 6) residential development comprising 90 residential units over ground floor ancillary accommodation including a refuse store, bicycle storage, switch room and ESB room at the Creamfields site, junction of Kinsale Road and Tramore Road, Cork.
90 units · 7,918.3 m²Builder not named
14 Jul 2026
SN0014346CY BCMS open-data feed
Block J is a proposed 6-storey, comprising ground plus 5, residential development located on the Creamfields site located at the junction of Kinsale Road and Tramore Road in Cork City. The building contains a total of 69 residential units arranged in a dual stair core arrangement. The block contains a total of 14 duplex units located at ground and first floor level in addition to the 55 as single floor open plan flats. At ground floor level the building contains ancillary accommodation such as refuse storage, bicycle storage, Switchroom and ESB rooms typical of a Block of Flats.
69 units · 6,960 m²Builder not named
23 Jun 2026
SN0014202CY BCMS open-data feed
Proposed Construction of Block G a Four Storey (Ground, First, Second with rooftop terrace) Residential Duplex Building incorporating Five Ground Floor own door accessed Apartments with Five own door accessed Duplex units over, including site ancillary works at Kinsale Road and Tramore Road, Cork.
10 units · 1,266.5 m²Builder not named
25 May 2026
SN0013498CY BCMS open-data feed
Proposed construction of 9 storey residential building including site ancilalry works at Kinsale Road and Tramore Road, Cork.
116 units · 10,278 m²Builder not named
18 Dec 2025
SN0013491CY BCMS open-data feed
Proposed construction of 9 storey building and site ancillary works at Kinsale Road and Tramore Road, Cork.
142 units · 13,493 m²Builder not named
18 Dec 2025
SN0013487CY BCMS open-data feed
Proposed Construction of 15 Storey building including podium deck, underground car park and site ancillary works at Kinsale Road and Tramore Road, Cork
112 units · 18,646 m²Builder not named
18 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Aug 2026 · Latest notice
2 unique events
Claregalway, Galway · Galway County Council · Planning ref 24/61773
Construction of new residential development consisting of 11 houses, 5 apartments, and 5 duplex units, along with all services and ancillary works at Units 3-23 Garrai Nuadháin, Lakeview, Claregalway
Unique event Works stated Scale Commenced
CN0145874GC BCMS open-data feed
Construction of new residential development consisting of 12 houses, along with all services and ancillary works at Units 1-2 and Units 24-33 Garraí Uí Nuáin, Lakeview, Claregalway
12 units · 1,299.4 m²Builder not named
10 Aug 2026
CN0140589GC BCMS owner-supplied export
Construction of new residential development consisting of 11 houses, 5 apartments, and 5 duplex units, along with all services and ancillary works at Units 3-23 Garrai Nuadháin, Lakeview, Claregalway
1,739.6 m²Builder named
06 Apr 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
08 Aug 2026 · Latest notice
7 unique events
Newcastle West, Limerick · Limerick City and County Council · Planning ref 22-840
Construction of House Nos. 83-93 Castle Place, Station Road, Newcastle West.
Reconciled event scale
14 units · 1,722.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Eureka Developments C Ltd
Unique event Works stated Scale Commenced
CN0145863LL BCMS open-data feed
Construction of House Nos. 28-30 & 52-57 Castle Place, Station Road, Newcastle West, Co. Limerick.
9 units · 932.4 m²Builder not named
08 Aug 2026
SN0011111LL BCMS open-data feed
Construction of Apartment Block E at Nos. 40-51 Castle Place, Station Road, Newcastle West, Co. Limerick.
12 units · 951.6 m²Builder not named
30 Sep 2024
CN0120183LL BCMS owner-supplied export
Construction of Apartment Blocks C & D at Nos. 22-27 & 58-63 Castle Place, Station Road, Newcastle West, Co. Limerick.
486.4 m²Builder named
30 Sep 2024
CN0119799LL BCMS owner-supplied export
Construction of Apartment Blocks A & B at Nos. 64-69 & 77-82 Castle Place, Station Road, Newcastle West, Co. Limerick.
486.4 m²Builder named
28 Sep 2024
CN0118593LL BCMS open-data feed
Construction of House Nos. 31-39 Castle Place, Station Road, Newcastle West, Co. Limerick
9 units · 932.4 m²Builder not named
19 Aug 2024
CN0114681LL BCMS owner-supplied export
Construction of House Nos. 83-93 Castle Place, Station Road, Newcastle West.
1,139.6 m²Builder named
24 Apr 2024
CN0109354LL BCMS owner-supplied export
Construction of House Nos. 1-7 & 70-76 Castle Place, Station Road, Newcastle West, Co. Limerick
14 units · 1,722.4 m²Builder named
31 Jan 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
07 Aug 2026 · Latest notice
4 unique events
Donabate, Dublin · Fingal County Council · Planning ref LRD0064/S3E
Construction of 90no. 3 storey dwelling houses
Reconciled event scale
325 units · 37,978.2 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Cairn Homes Construction Ltd
Unique event Works stated Scale Commenced
SN0014599FL BCMS open-data feed
Construction of a 5 storey building consisting of 1 no. retail unit on the ground floor and 48 no. apartments
48 units · 5,517 m²Builder not named
07 Aug 2026
SN0014406FL BCMS open-data feed
Construction of a 5 storey building consisting of a commercail unit at ground floor with 45 no. apartments over. (Hampden Plaza)
45 units · 5,081 m²Builder not named
01 Jul 2026
CN0140056FL BCMS open-data feed
Construction of 325 no. dwelling houses and all ancillary works
325 units · 37,978.2 m²Builder not named
23 Mar 2026
CN0139822FL BCMS owner-supplied export
Construction of 90no. 3 storey dwelling houses
10,872.1 m²Builder named
17 Mar 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
07 Aug 2026 · Latest notice
21 unique events
Donabate, Dublin · Fingal County Council · Planning ref LRD0039/S3
Construction of a Six storey residential apartment block (BA06) comprising of 50 No. Apartments.
Reconciled event scale
112 units · 10,153.6 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0146055FL BCMS open-data feed
Construction of a three storey residential block (BZ16) to be known as Units 1-12, The Heights at Ballymastone Phase 2 Residential Development, Donabate, Co. Dublin.
12 unitsBuilder not named
07 Aug 2026
CN0140053FL BCMS owner-supplied export
Construction of a Six storey residential apartment block (BA06) comprising of 50 No. Apartments.
5,142.4 m²Builder named
23 Mar 2026
CN0140049FL BCMS owner-supplied export
Construction of a six storey residential apartment block (BA05) comprising of 42 No. Apartments.
3,950.1 m²Builder named
23 Mar 2026
CN0139577FL BCMS owner-supplied export
Proposed construction of 5 no. bike and bin store (to be known as BX06 The Garden, BX11A The Oaks, BX11B the Oaks, BX13 The Oaks and BX25 The Rise) At Ballymastone Phase 2 Residential Development, Donabate, Co. Dublin
82.5 m²Builder named
09 Mar 2026
SN0013833FL BCMS open-data feed
Construction of a bike and bin store (to be known as BX10, The Oaks) At Ballymastone Phase 2 Residential Development, Donabate, Fingal.
39.7 m²Builder not named
04 Mar 2026
SN0013832FL BCMS open-data feed
Construction of a bike and bin store (to be known as BX23, The Oaks) At Ballymastone Phase 2 Residential Development, Donabate, Fingal.
26 m²Builder not named
04 Mar 2026
SN0013831FL BCMS open-data feed
Construction of a bike and bin store (to be known as BX15, The Rise) At Ballymastone Phase 2 Residential Development, Donabate, Co. Dublin
30.7 m²Builder not named
04 Mar 2026
CN0138724FL BCMS owner-supplied export
Construction of a three storey residential block (BZ22) comprising of 11 No. Duplexes and 6 No. Apartments.
1,778.5 m²Builder named
17 Feb 2026
CN0138445FL BCMS owner-supplied export
Construction of a three storey residential block (BZ03) comprising of 4 No. Apartments and 5 No Duplexes.
945 m²Builder named
09 Feb 2026
CN0136088FL BCMS owner-supplied export
Construction of a three storey residential block (BZ08 5-8 The Gardens) containing 4 units comprising of 2 No. Duplexes & 2 No. Apartments
384.2 m²Builder named
24 Nov 2025
CN0136087FL BCMS owner-supplied export
Construction of a three storey residential block (BZ08 130-133 The Oaks) containing 4 units comprising of 2 No. Duplexes & 2 No. Apartments
384.2 m²Builder named
24 Nov 2025
CN0136086FL BCMS owner-supplied export
Construction of a three storey residential block (BZ01) containing 2 Units comprising of 1 No. Duplex & 1 No. Apartment
223.4 m²Builder named
24 Nov 2025
SN0013342FL BCMS open-data feed
Proposed construction of a bike and bin store (to be known as BX24, The Oaks) At Ballymastone Phase 2 Residential Development, Donabate, Co. Dublin
25.5 m²Builder not named
14 Nov 2025
SN0013341FL BCMS open-data feed
Proposed construction of a bike and bin store (to be known as BX08A, The Boulevard) At Ballymastone Phase 2 Residential Development, Donabate, Co. Dublin
16 m²Builder not named
14 Nov 2025
SN0013325FL BCMS open-data feed
Proposed construction of a bike and bin store (to be known as BX09, The Way) At Ballymastone Phase 2 Residential Development, Donabate, Co. Dublin
53.7 m²Builder not named
07 Nov 2025
CN0134790FL BCMS owner-supplied export
Construction of a three storey residential block (BZ08 109-112 The Oaks) containing 4 units comprising of 2 No. Duplexes & 2 No. Apartments
384.2 m²Builder named
17 Oct 2025
CN0134301FL BCMS owner-supplied export
Construction of 112 No. 2 & 3 storey residential dwellings together with associate site works.
112 units · 10,153.6 m²Builder named
06 Oct 2025
CN0133814FL BCMS owner-supplied export
Construction of a five storey residential block (BA04) comprising of 32 No. Apartments.
3,090.9 m²Builder named
19 Sep 2025
CN0131420FL BCMS owner-supplied export
Construction of a three storey residential block (BZ09) comprising 10 No. Duplexes and 5 No. Apartments.
100 m²Builder named
18 Jul 2025
CN0131387FL BCMS owner-supplied export
Construction of a 46 No. 2 & 3 storey residential dwellings together with associate site works.
46 units · 4,726.9 m²Builder named
18 Jul 2025
CN0131333FL BCMS owner-supplied export
Construction of a three storey residential block (BZ23) containing 15 Units comprising of 10 No. Duplexes and 5 No. Apartments
100 m²Builder named
18 Jul 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
07 Aug 2026 · Latest notice
10 unique events
Lucan, Dublin · South Dublin County Council · Planning ref SDZ24A/0018W
Clonburris SDZ (CN19), Adamstown, Lucan, Co. Dublin comprising the construction of 64 No. residential units in 1 No. 6-storey apartment block including associated site development works
Reconciled event scale
64 units · 5,016.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Quintain Construction Company Ltd
Unique event Works stated Scale Commenced
CN0145855SD BCMS open-data feed
Clonburris SDZ (CN19), Adamstown, Lucan, Co. Dublin comprising the construction of 64 No. residential units in 1 No. 6-storey apartment block including associated site development works
64 units · 5,016.4 m²Builder not named
07 Aug 2026
SN0011658SD BCMS open-data feed
Clonburris SDZ (CN17), Adamstown, Lucan, Co. Dublin comprising the construction of a single-storey ESB substation with an adjoining Switchroom including associated ancillary works.
30.1 m²Builder not named
13 Dec 2024
SN0011657SD BCMS open-data feed
Clonburris SDZ (CN10), Adamstown, Lucan, Co. Dublin comprising the construction of 1 No. 3-storey block with 4 No. single-storey units & 4 No. 2-storey units, bike & bin store, ESB Substation & Switchroom & associated site works.
8 units · 1,046 m²Builder not named
13 Dec 2024
SN0011656SD BCMS open-data feed
Clonburris SDZ (CN15), Adamstown, Lucan, Co. Dublin comprising the construction of 1 No. 3-storey block with 8 No. single storey units on the Ground Floor & 8 No. 2-storey units on the 1st & 2nd Floors & associated site works.
16 units · 1,709.3 m²Builder not named
13 Dec 2024
SN0011655SD BCMS open-data feed
Clonburris SDZ (CN14), Adamstown, Lucan, Co. Dublin comprising the construction of 1 No. 3-storey block with 6 No. single storey units on the Ground Floor & 6 No. 2-storey units on the 1st & 2nd Floors & associated site works.
12 units · 1,285.8 m²Builder not named
13 Dec 2024
SN0011654SD BCMS open-data feed
Clonburris SDZ (CN13), Adamstown, Lucan, Co. Dublin comprising the construction of 1 No. 3-storey block with 10 No. single storey units on the Ground Floor & 10 No. 2-storey units on the 1st & 2nd Floors & associated site works.
20 units · 2,140.1 m²Builder not named
13 Dec 2024
SN0011653SD BCMS open-data feed
Clonburris SDZ (CN12), Adamstown, Lucan, Co. Dublin comprising the construction of 1 No. 4-storey block with 9 No. 2-storey units on the Ground & 1st Floors & 9 No. 2-storey units on the 2nd & 3rd Floors & associated site works.
18 units · 2,304.9 m²Builder not named
13 Dec 2024
SN0011652SD BCMS open-data feed
Clonburris SDZ (CN11), Adamstown, Lucan, Co. Dublin comprising the construction of 1 No. 3-storey block with 8 No. single storey units on the Ground Floor & 8 No. 2-storey units on the 1st & 2nd Floors & associated site works.
16 units · 1,717.9 m²Builder not named
13 Dec 2024
SN0011651SD BCMS open-data feed
Clonburris SDZ (CN9), Adamstown, Lucan, Co. Dublin comprising the construction of 64 No. residential units in 1 No. 6-storey apartment block including associated site development works.
64 units · 5,016.4 m²Builder not named
13 Dec 2024
CN0123191SD BCMS owner-supplied export
Clonburris SDZ (CN16), Adamstown, Lucan, Co. Dublin comprising the construction of 21 No. new 2-3 storey semi-detached and terrace houses & associated site development works.
2,632.4 m²Builder named
13 Dec 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
05 Aug 2026 · Latest notice
14 unique events
Newtownmountkennedy, Wicklow · Wicklow County Council · Planning ref 24-154
Estate 8 - 75 Residential Housing Units at Oakmount, Newtownmountkenn edy, Co. Wicklow.
Unique event Works stated Scale Commenced
CN0147696WW BCMS open-data feed
Creche building fit-out works to include all internal subdivisions, mechanical / electrical / fire safety services, lifts, finishes plus fixed and loose furniture as required to obtain beneficial use of the building. Works to include the finishes and furniture required to all external creche play areas.
663 m²Builder not named
05 Aug 2026
CN0129177WW BCMS open-data feed
New community building and ancillary works.
505 m²Builder not named
31 Mar 2025
CN0129176WW BCMS owner-supplied export
New creche building and ancillary works.
663 m²Builder named
31 Mar 2025
CN0120629WW BCMS owner-supplied export
Estate 8 - 75 Residential Housing Units at Oakmount, Newtownmountkenn edy, Co. Wicklow.
75 units · 7,500 m²Builder named
27 Sep 2024
CN0119773WW BCMS open-data feed
Estate 4 - 71 Residential Housing Units at Alderwood, Newtownmountkennedy, Co. Wicklow.
71 units · 8,194.1 m²Builder not named
27 Sep 2024
CN0119723WW BCMS owner-supplied export
Estate 6 - 16 Residential Housing Units at Rose Gardens, Rosebay, Newtownmountkenn edy, Co. Wicklow.
16 units · 1,600 m²Builder named
27 Sep 2024
SN0011179WW BCMS open-data feed
Estate 6 Duplex Units 17-24 Rose Gardens, Rosebay, Newtownmountkennedy, Co. Wicklow.
8 units · 930.2 m²Builder not named
20 Sep 2024
SN0011069WW BCMS open-data feed
Estate 4 Maisonettes 46-49 Aldergreen, Alderwood, Newtownmountkennedy, Co. Wicklow.
4 units · 254 m²Builder not named
20 Sep 2024
SN0011068WW BCMS open-data feed
Estate 6 Duplex Units 41-48 Rose Gardens, Rosebay, Newtownmountkennedy, Co. Wicklow.
8 units · 930.2 m²Builder not named
20 Sep 2024
SN0011057WW BCMS open-data feed
Estate 4 Maisonettes 64-67 Alderway, Alderwood, Newtownmountkennedy, Co. Wicklow.
4 units · 254.1 m²Builder not named
20 Sep 2024
SN0011056WW BCMS open-data feed
Estate 4 Maisonettes - 50-53 Aldergreen, Alderwood, Newtownmountkennedy, Co. Wicklow.
4 units · 254.1 m²Builder not named
20 Sep 2024
SN0011055WW BCMS open-data feed
Estate 6 Duplex Units 9-16 Rose Gardens, Rosebay, Newtownmountkennedy, Co. Wicklow.
8 units · 930.2 m²Builder not named
20 Sep 2024
SN0011054WW BCMS open-data feed
Estate 4 Maisonettes 56-59 Alderway, Alderwood, Newtownmountkennedy, Co. Wicklow.
4 units · 254.1 m²Builder not named
20 Sep 2024
SN0010938WW BCMS open-data feed
Estate 6 Duplex Units 1-8 Rose Gardens, Rosebay, Newtownmountkennedy, Co. Wicklow.
8 units · 930.2 m²Builder not named
20 Sep 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
04 Aug 2026 · Latest notice
5 unique events
Athenry, Galway · Galway County Council · Planning ref 2560251
Fearann na hEascrach Phase 1 - Construction of 121 No. dwelling houses consisting of 12 No. semi detached and 109 terraced units. Units 1 - 9, 14 - 87, 96 - 133 Fearann na hEascrach
Reconciled event scale
4 units · 11,463 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Aspect Design To Finish Ltd
Unique event Works stated Scale Commenced
SN0014567GC BCMS open-data feed
Construction of new single storey creche building
311 m²Builder not named
04 Aug 2026
SN0013683GC BCMS open-data feed
Units 39, 40, 41, 42 Fearann na hEascrach (Maisonette M03). Construction of 1 no apartment building containing 4 no Maisonettes and all associated works.
4 units · 231.6 m²Builder not named
03 Feb 2026
SN0013682GC BCMS open-data feed
Units 43, 44, 45, 46 Fearann na hEascrach (Maisonette M02). Construction of 1 no apartment building containing 4 no Maisonettes and all associated works.
4 units · 231.6 m²Builder not named
03 Feb 2026
SN0013680GC BCMS open-data feed
Units 103, 104, 105, 106 Fearann na hEascrach (Maisonette M01). Construction of 1 no apartment building containing 4 no Maisonettes and all associated works.
4 units · 231.6 m²Builder not named
03 Feb 2026
CN0136409GC BCMS owner-supplied export
Fearann na hEascrach Phase 1 - Construction of 121 No. dwelling houses consisting of 12 No. semi detached and 109 terraced units. Units 1 - 9, 14 - 87, 96 - 133 Fearann na hEascrach
11,463 m²Builder named
08 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.