← Complete commencement inventory

BCMS open-data feed

The development will consist of: works to St — Booterstown

Booterstown, Dublin · Dublin

Source notice reference
CN0144771DR
Commencement date
2026-07-13
Planning reference
D25A/0087/WEB
Planning authority
Dun Laoghaire Rathdown County Council
Project type
Extension
Floor area
3715 m² · per notice; not summed
Indexed source check
2026-08-15T07:50:10Z

Public-safe works description

The development will consist of: works to St. Andrew’s College, which includes a Protected Structure (RPS 55) and will comprise of: 1) The demolition of the 1980s single storey extension known as House 5 (approx. 515 sqm) adjoining the protected structure to the north. 2) The removal of temporary accommodation comprising 5 no. sets of mobile classrooms. 3) The construction of a 4-storey learning centre as an extension to the school (max parapet height 35.550m) with teaching, administration, guidance and learning support accommodation, with forecourt, connected heat pump at ground floor level and green roof (approx.3720 sqm). 4) Realignment of the existing internal roads, paths and car parking layouts including additional set down areas and cycle parking (118 in total, 80 covered). 5) Addition of 5 no. EV charging docks to existing car parking numbers. 6) Creation of pocket parks and landscaped seating areas adjacent to hockey pitches and new learning building. 7) Reconfiguration of and improvements to Booterstown Avenue entrance. 8) Removal of gates and pillars at Booterstown Avenue and finishes to forecourts upgraded and pillars provided. 9) Removal of existing gates at Rosemount Terrace and erection of new vehicular and pedestrian gates, repositioned within the site for increased pedestrian safety, partial demolition of wall south of existing entrance. 10) All associated works including landscaping, access and infrastructure to facilitate development. A Natura Impact Statement has been prepared in respect of the proposed development.

This is one source-family notice identity, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.

Open grouped project and every phase · Open official source